1 / 14

A PESENTATION ON WIND ENERGY GENERATION BY

A PESENTATION ON WIND ENERGY GENERATION BY. S.P.S.NEEMRANA. SE(E). WIND ENERGY GENERATION. 80% depreciation in the first year (Commissioned before September end) 40% depreciation in the first year (Commissioned before March end). WIND ENERGY GENERATION. LAND.

corinne
Download Presentation

A PESENTATION ON WIND ENERGY GENERATION BY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A PESENTATIONON WIND ENERGY GENERATION BY S.P.S.NEEMRANA SE(E)

  2. WIND ENERGY GENERATION • 80% depreciation in the first year (Commissioned before September end) • 40% depreciation in the first year (Commissioned before March end)

  3. WIND ENERGY GENERATION

  4. LAND VESTA RRB : Cost of land included limited to Rs. 6 Lakhs. Registration charges extra. SUZLON: Cost of land included limited to Rs.15 Lakhs.

  5. CAPACITY INITIALCOST VESTA RRB – 600 KW SUZLON-600 KW VESTA RRB – 350Lakhs SUZLON-395 Lakhs

  6. PAYBACK PERIOD(APPROX) LIFE EXPECTANCY VESTA RRB – 20 Years SUZLON- 20 Years VESTA RRB - 7 Years SUZLON-7 Years

  7. GENERATION(Units per Annum) VESTA RRB 14,00,000 units per Annum SUZLON – 17,00,000 units per Annum

  8. AMC VESTA RRB : Annual Operation & maintenance contract available. SUZLON : From 2nd year from date of commissioning to 10th year Rs.10 Lacs per WTG with 5% annual escalation after second year, for each year cumulatively.

  9. INTERFACING WITH GRID VESTA RRB: If the OHT line exceeds 250 m then extra @ Rs.8/- Lakhs per KM.

  10. SALIENT FEATURES-VESTA VESTA RRB Indo-Danish joint venture for manufacture of wind electric generators. Microprocessor based fully automatic control system. Integrated power transmission mechanism. ISO 9001:2000 Certification for manufacture, installation and servicing of WEGs from DNV.

  11. SALIENT FEATURES- VESTA First WEG in India to receive the type approval certificate from C-WET (Centre for wind energy technology), an autonomous body offers the pitch regulated WEGs. This feature allows the blades to pivot along their longitudinal axis. As the wind velocity increases, the surface against the wind decreases

  12. SALIENT FEATURES- SUZLON SUZLON R & D at Suzlon Energy GmBh Germany for Wind energy converters & AE - Rotor Technical BV Netherlands for rotor blades. Minimum stress and load through well balanced weight distribution. Advanced hydrodynamic fluid coupling absorbs load peaks

  13. SALIENT FEATURES- SUZLON Hi-speed asynchronous generator with multi stage intelligent switching compensation system delivers power factor up to 0.99 Grid friendly design generates harmonics free pure sinusoidal power Unmatched fine pitching with 0.1 degree resolution to extract every possible unit of power

  14. CO-ORDINATION AND FOLLOW-UP WITH GOVT. AND RELATED AGENCIES. VESTA RRB YES SUZLON YES