Antares OM: cost and possible evolution towards the KM3 WP3-4-5 meeting, Paris, 15-16/10/2008
Contents • Antares OM cost • Possible improvements • KM3 OM cost • Conclusion
Antares breakdown cost Optical modules cost 2435 k€*, 11% of the detector cost (investment) * Not included pressure test, transportation
Components cost OM price dominated by: • PMT • Sphere • penetrator
Full costs without manpower Full cost includes: R&D, assembly tools, test benches…
Full costs with manpower Manpower: 1996-2007 Cost dominated by manpower and components
Production costs only with manpower Only with CEA manpower during the OM production at Saclay (2004-2005) To be compared to 4 k€ with full assembly subcontracted (tender quotation) and CEA manpower to manage and follow the production
Antares OM cost vs photocathode surface in €/(cm2xQ.E.),with 500 cm2 forphotocathode surface and 24% of QE Production part of Antares OM (components and man power): ~40 €/(cm2xQ.E.)
Construction time In an ideal scenario…. without problem
Lessons from Antares Possible improvements • Remove internal LED • Remove vacuum port on the sphere • Reduce the diameter of the sphere (13’’ instead 17’’) • Remove the mu-metal cage • Change the gel • Pressure test of the assembled OM • Reduce the number of wires in the cable (penetrator size, less connections…) • Use space inside the OM for electronics What to keep? • Visual indication of the sphere pressure • OM test after assembly and closure What to investigate? • OM failure (especially dead OMs and water ingress)
OM cost for KM3 • The proposal is to calculate the OM price per ‘’cm2‘’ of photocathode • vs QE • R&D and preparation production are funded by FP6 and FP7, • so only production costs must be included • But the OM cost is not the only parameter, the final configuration of the • OM has impact on the number of OM, mechanics, electronics and read out
Estimated cost of KM3 OM Components price - Save 40% by: • removing mu-metal shielding, vacuum port on sphere and internal led • Decreasing the number of wires • Increasing Q.E. • Keep competition between supplier (PMTs, spheres…) Assembly time - Reduced by 25% the time construction Total - Gain of ~25% on equivalent Antares OM with assembly subcontracted but without KM3 man power: KM3 OM=~30 €/(cm2 x Q.E.)
Conclusion • Antares OM cost dominated by components cost and man power • We can decrease the OM price by ~25% from Antares • Cost comparison of different OMs for KM3 is not simple (impact on • mechanics, electronics…) • We need to have a cost model to compare OM solutions