100 likes | 122 Views
Consent to establish (NOC) means No objection certificate which is issued to ensure that the proposed industry being set up will not cause any harm to the environment or society.<br>https://www.corpseed.com/knowledge-centre/how-to-apply-for-noc-cto-cte-authorization-from-gujarat-state-pollution-control-board
E N D
How to apply for NOC/CTO/CTE/Authorization from Gujarat Pollution Control Board (GPCB) Introduction To Gujarat Pollution Control Board (GPCB) Consent to establish (NOC) means No objection certificate which is issued to ensure that the proposed industry being set up will not cause any harm to the environment or society. For setting up of industries or Hi there, T
for change in modernization/ production process/ capacity improvement, provision has been made that the entrepreneur shall have to obtain No Objection Certificate from the State Pollution Board General Siting Guidelines For Gujarat Pollution Control Board (GPCB) Every Industrial unit, after installation of required Environmental Management System (pollution control measures) and on starting production activities, immediately shall apply for Consolidated Consent and Authorization (CCA) under the provisions of the Water Act, the Air Act and the Hazardous Waste Rules. Applicant shall ensure to obtain Consent to Establish (CTE) prior to apply for the Consent to Operate (CCA). On receipt of CCA application, Board officials will inspect the industrial plant to verify the installed Environment Management System (EMS) to prevent and control pollution and also get checked its efficacy. After careful legal and technical scrutiny, the Consolidated Consents and Authorization (CCA) will be issued to the applicant specifying various terms and conditions and discharge standards. NOTE: CTE and CCA are being issued with validity of 5 years. Before expiry of validity of the CCA, applicant shall have to apply for the renewal of it. Applicant industry shall have to comply with all the conditions and standards stipulated in its CTE/ CCA order and shall have to submit Monthly as well as Annual returns/forms. Fee Structure Fee for NOC may vary depending upon the category and amount of capital investment of the proposed industry. For more specific details, click Here
Procedure For Gujarat Pollution Control Board (GPCB) Registration / Consent Our Expert team will draft & file the application with the GPCB Department & will follows-up with GPCB Department. For more information contact our customer care on 8448 444 985 or info@corpseed.com. APPLY NOW Documents Required To Apply For Gujarat Pollution Control Board (GPCB): Application processing fees for the period of five years with break-up. Site plan showing the distance of (not applicable if the industry is to be located in GIDC estate Nearest residential area with certificate of Talati /Mantri from the proposed site. Nearest of state/ national highway from the site of the unit/industries. Nearest Lake/ Pond/ River/ Sea/ Canal/ Forest area and any water body. Nearest spaces of tourist and historical importance. School, collage, Temple, Mosque etc. Lay Out plan showing the location of the: Vents/ Stacks/ Chimney and emission points. Drainage and final disposal for liquid effluent Solid waste collection/ storage/ disposal facility Total available open land in the industrial premises List of partner/ Directors (names along with residential address) and telephone number. Details of effluent Treatment Plant along with flow diagram.
Letter of membership of common effluent Treatment plant if applicable. Analysis report of Treated and untreated effluent (Air, water and Hazardous solid waste for Schedule II category from Laboratory specified under HW Rules) Break-up of water uses and water balance. Details of manufacturing process, with process flow diagram and all chemical equations. Environmental statement (form-V) Certificate of SSI. (Compulsory for HW fees) Details of air pollution control measures: stack/ chimney wise for flue gas and process emission. Boiler, Steam generating certificate indicating steam generation and consumption of coal tons per day duly certified by office of boiler inspector (in case of IBR Boiler) Compliance regarding public hearing /environmental clearance certificate, if applicable. List of raw material with quantity per month (MT/M) (Verify Applicability of CPCB Registration) List of product/by-product with quantity per month (MT/M) (Verify Applicability of CPCB Registration for disposal). Copies of consent order /authorization order along with CC&A for which they have last consent. C.A. Certificate for project (if SSI unit) C.I. NO. For Dyes Properly filled up Form: I as per Hazardous waste (M&H) amended Rules, 2003. Annual Report in Form-IV (in case of renewal application), with documents of disposal complying Generation, Stock and Disposal justifying stock (Every Year by 31st January). Annual Report in Form 12 in case of recycler/ re-refiner of HW as covered in Schedule 4, 5 and 6 of HW Rules.
Annual Report in Form 13 in case of Generator or Auctioneer of HW as covered in Schedule 4, 5 and 6 of HW Rules. Form-V under Hazardous waste Rules-1989 in case of accident. Form-VI & Form-VII in case of important of Hazardous waste under Hazardous waste Rules-1989. Photographs of Hazardous Waste Storage facilities. Undertaking should be checked as per amended Rules, 2003 – In case of non-applicability of HW Rules. Details of step taken by the applicant for reduction and prevention in the waste generated or for recycling or reuse (Copy of under taking for the same). Membership certificate of common TSDF /Common incinerator (if applicable) Details of HW as per 2003 amended rules or for all categories with Quantity, for Reception (Reprocessor/ Re-cycler), Generation, Collection, Storage, Treatment (Details of Method) and Disposal (Details of Method). Compliance of earlier authorization in case of renewal. Copy of CPCB registration or proof of application made to CPCB in case of recycler/ re-refiner of HW as covered in Schedule 4, 5 and 6 of HW Rules. Copy of Inter State Transport NOC under Rule 7(6) in case of Selling/ receiving HW To/ From State other than Gujarat. Inspection Report in CPCB Performa in case of authorization for registration as recycler/ reprocessor. In Case of rejected application compliance of reasons of rejection. Form I of Environmental Clearance, if Environmental Clearance is applicable For ground water, central ground water authority permission, if in dark zone.
How to apply for Gujarat Pollution Control Board (GPCB) NOC / License / Consent? Fill-up our requirement form Here. We would collect all your documents and file them directly (Online & Offline) with State Pollution Control Office. You would receive your completed Pollution Control Consent to Established/Operate registration certificate by E-mail and courier Have Legal Questions? Get help from an experienced legal adviser. Schedule your consultation at a time that works for you and it’s absolutely FREE. Name Email Mobile Number. Request Callback Connect With Us Latest Services Business Monthly Business Yearly Conversion of Private limited company to Section 8 BUREAU OF INDIAN STANDARDS (BIS) REGISTRATION Producer Company Registration How to Write a Business Plan | How to Create a Business Plan
Siddha Manufacturing license Certification Patent & Trademark Ayush Ayurveda Recent Blogs Zomato Partner Registration | Zomato Registration | How to Register Restaurant in Zomato | Documents Required | Commission Fee Zomato Partner Registration | Zomato Registration | How to Register Restaurant in Zomato | Documents Required | Commission Fee Zomato Partner Registration | Zomato Registration | How to Register Restaurant in Zomato | Documents Required | Commission Fee Zomato Partner Registration | Zomato Registration | How to Register Restaurant in Zomato | Documents Required | Commission Fee Zomato Partner Registration | Zomato Registration | How to Register Restaurant in Zomato | Documents Required | Commission Fee Center Government Reduces ESI Contribution Rate to 4% - June 2019 Update | Corpseed HOW TO GET HEALTH TRADE LICENSE? How to obtain Eating House License? Online Vendor Registration Process for Swiggy FSSAI allows small organic growers to sell produce without certification till 2020 - Corpseed Legal Guide Download legal guide on how to successfully start and manage business in India & achieve 100% compliance. Enter Email Id... Enter Mobile Number Download Related Services DPCC Waste Authorizations 10000 APPLY NOW READ MORE
As per Central Pollution Control Board, Each waste collection activity is required to take prior permission to establish from their respective State Pollution Control Board. A business activity may be categorized as Collection, Segregation, Recycling, Processing etc of the waste generated during any other industrial process. The Delhi Pollution Control Committee issues Authorization to applicants for the establishment and commencement of a business activity. Other DPCC Waste Authorizations 10000 APPLY NOW READ MORE As per Central Pollution Control Board, Each waste collection activity is required to take prior permission to establish from their respective State Pollution Control Board. A business activity may be categorized as Collection, Segregation, Recycling, Processing etc of the waste generated during any other industrial process. The Delhi Pollution Control Committee issues Authorization to applicants for the establishment and commencement of a business activity. Pollution Board NOC READ MORE Epidemiological studies have established a close relationship between exposure to ambient air pollution and morbidity and mortality from cardiopulmonary diseases. Air pollution is a complex mixture of various gases, particulates, hydrocarbons, and transition metals. Gujarat Pollution Control Board 5000 APPLY NOW READ MORE The Government of Gujarat constituted the GPCB (Gujarat Pollution Control Board) on 15.10.1974 as per provisions under the Water (Prevention and Control of Pollution) Act, 1974, the with a view to protect
the environment, prevent and control the pollution of water in the State of Gujarat, that occupies a prominent niche in progressive and industrial development of the country. Get helpful tips and info from our newsletter! Type Your Email Here... Submit Go to Knowledge Centre info@corpseed.com +91-8448 444 985 F-39, Sector 6, Noida, Uttar Pradesh. ABOUT COMPANY Knowledge Centre Become A Partner Contact Us About Us Join our team COMPANY POLICIES Privacy policy Terms and conditions Refund policy Law Updates SiteMap POPULAR SERVICES
GST Registration Proprietorship Firm Trademark Registration FSSAI Basic Registration Private Limited Company Change Your CA Use of Corpseed services is subject to our Terms of Service and Privacy Policy.