Long Bo FT and Flanges

Long Bo FT and Flanges. April 12, 2012 talk Hans Jostlein. Based on Comments and Requirements from the April 4 presentation: Increase the distance between HV Feed and TPC Increase the distance between central purity monitor and TPC / HV feed

Download Presentation

Long Bo FT and Flanges

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein Long Bo FT and Flanges

  2. Based on Comments and Requirements from the April 4 presentation: Increase the distance between HV Feed and TPC Increase the distance between central purity monitor and TPC / HV feed Raise the HV FT flange above the insulation atop the big 33 ½”) flange to diminish icing danger Requested Design Changes from 4/4/2012 Long Bo FT and Flanges

  3. Move the TPC away from the Tank Center. • This frees up radial space for the purity monitor and the HV Feed • Raise the TPC to the same elevation as the central purity monitor, • maintaining the same minimum LAr depth. Implementation of new Design Requirements Long Bo FT and Flanges

  4. Long Bo FT and Flanges

  5. Long Bo FT and Flanges

  6. Long Bo FT and Flanges

  7. Analyze bubble paths and Bubble Size Control • Add a tight fitting seal at the bottom of the PE sleeve. It will sea when cold • Conical bottom end of the PE sleeve to prevent bubble aggregation • Venting of the space surrounding the 7/8” center tube to its inside • Venting the 7/8 tube inside through tiny holes in the contact cup at the bottom. Hole size 0.2 mm requires 2 cm LAr head; we will use 0.5 mm or larger. Additional Design Features: Bubbles Long Bo FT and Flanges

  8. Long Bo FT and Flanges

  9. Purge the space surrounding the PE sleeve into the GAr space at the top. • Purge the GAr space near the top into an external purge line • Purge the GAr space near the TPC Signal Feedthrough into an external purge line Additional Design Features: Purging Long Bo FT and Flanges

  10. New Feedthrough Design New Features: • Top Flange raised above the top insulation • Bubble stop insert at bottom of PE Sleeve (See later slide) • Inverted cup/ spring contact arrangement (see later slide) • Extended to great depth to avoid having an insulated support • Bubble and purge management (see later slide) Long Bo FT and Flanges

  11. In order to minimize the TPC assembly diameter, thus maximizing the stand-off distances of HV FT and Purity monitor, • We invert the usual arrangement: • The spring loaded finger is attached to the TPC cathode HV tubing, while the (inverted) cup is welded to the HV FT center tube. • This change turns out useful and effective for bubble control (see previous slide) Additional Design Features: HV Contact Area Long Bo FT and Flanges

  12. Long Bo FT and Flanges

  13. We will have two windows, both existing: • An 8” CF window and a 6” CF window. • These will help during HV FT installation Additional Design Features: Windows Long Bo FT and Flanges

  14. Long Bo FT and Flanges

  15. Long Bo FT and Flanges

  16. Long Bo FT and Flanges

  17. Making the Long Bo High Voltage Fedthrough Cutting grooves into the PE: Long Bo FT and Flanges

  18. Making the Long Bo High Voltage Fedthrough Cutting grooves into the PE: Long Bo FT and Flanges

  19. Making the Long Bo High Voltage Fedthrough Cutting grooves into the PE: Long Bo FT and Flanges

  20. Long Bo FT and Flanges

  21. Long Bo FT and Flanges

  22. Long Bo FT and Flanges

More Related