MaxCell Installation Reports India

MaxCell Installation Reports India. Amit Dubey MaxCell Market Manager - India. Date: 17 th Feb 2010 End User: BSNL Installer: Milliken Venue: Sector 62, Telephone Exchange , Noida Classification: Outside Plant. BSNL (Noida, India). Installed MaxCell. Rodding.

cree
Download Presentation

MaxCell Installation Reports India

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MaxCell Installation ReportsIndia Amit Dubey MaxCell Market Manager - India

  2. Date: 17th Feb 2010 End User: BSNL Installer: Milliken Venue: Sector 62, Telephone Exchange , Noida Classification: Outside Plant BSNL (Noida, India) Installed MaxCell Rodding Cable praparation Cable installation Amit Dubey MaxCell Market Manager - India

  3. Date: 17th Feb 2010 End User: BSNL Installer: Milliken Venue: Sector 62, Telephone Exchange , Noida Classification: Outside Plant Installation Details Final Fill Ratio Pull Length, M MaxCell Installation Cable Installation Sweeps, degrees Conduit ID, mm Sec- tion Existing Cable OD, mm Style Time, min Tension, kgs Time, min Tension, kgs OD, mm • Installation Detail:- • After completion of trial in BSNL Kolkata in 110-100mm conduit, BSNL corporate office wanted to see MaxCell use in smaller 40-33 mm duct . • We tried Roding in five site but couldn’t succeed because of the blocking, chocking and broken of duct . Even in last site we found difficulty in two places, at one place duct was broken and in another place two couplers were not properly placed. • After repairing and cleaning the duct, we installed rope between two manhole and installed 3614-1 Maxcell and successfully installed another 12mm cable in the same duct. Amit Dubey MaxCell Market Manager - India

  4. Date: 17th Feb 2010 End User: BSNL Installer: Milliken Venue: Sector 62, Telephone Exchange , Noida Classification: Outside Plant Second breaking point First breaking point Two misplaced couples Successfully installed MaxCell and Cable. Amit Dubey MaxCell Market Manager - India