Ranney Collector Overview • Pump Station • Central Reinforced Concrete Caisson • Horizontal Well Screens
Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing
Caisson Construction L1 L1 L2 Grade Grade Grade L1 L1 STEP 1 STEP 2 STEP 3
Initial Caisson Lift with Cutting Shoe, Toledo Bend Reservoir
Caisson Lift with Ports, Lake Havasu City
Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing
Lateral Projection Grade SWL Caisson Lateral A Lateral B Ports
TYPICAL BORE PILOT • Minimize Friction • Remove Material • Provide Horizontal Bore
Laterals Installation Bore Pilot & Projection Pipe Centered On Port Assembly
Lateral Installation Projection Pipe Advancement
Lateral Installation Projection Pipe Advancement
Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing
Screen Installation Grade SWL Caisson Lateral A Lateral B (Wire-Wrap Screen) (Wire-Wrap Screen)
Development By Overpumping Q Grade SWL Caisson Pump Laterals
Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing
Ranney Collector Conceptual Design and Yield
Input Parameters / Design Assumptions T = 482,600 gpd/ft S = 0.313 K = 5602 gpd/ft sq B = 86 feet A = 700 feet Zi = 75 feet Laterals – 10 to 12 Lateral Radius – 0.5 ft Lateral Length – 200 ft Caisson Radius – 8 ft Pumping Level – 15 ft above laterals
Characteristics of Ranney System • $12.6 to $16.0 million for Total System • 100% of Construction and Maintenance On Shore • Yield Remains High When River Migrates • Pilot Testing to Confirm Yield