Subsea Reliability 17N Report 2010

Subsea Reliability 17N Report 2010. Activities on 17N Reliability -Where did we leave this Follow up on field reliability data (OREDA Mng.) Clarity on Technology Readiness Level (TRL) Alignment with new DnV Qualification (DnV A 203) Operations- operability and integrity

Download Presentation

Subsea Reliability 17N Report 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Subsea Reliability 17N Report 2010 Activities on 17N Reliability -Where did we leave this • Follow up on field reliability data (OREDA Mng.) • Clarity on Technology Readiness Level (TRL) • Alignment with new DnV Qualification (DnV A 203) • Operations- operability and integrity • Training (workshops and University) Outstanding action • API 17N to be incorporated into ISO (ref ISO 20815)-Jans New Action • Extend API 17N to incorporate Integrity Management (Operations) • API 17N-1 with API17N becomes annex (incorporate Workover)

  2. Subsea Reliability 17N Report 2010 Activities to 17N Reliability Discussions with ASME and SUT on forum on subsea Integrity Management (Call for subcommittee members) Approached API on API University (need support on how this can be progressed) SUT Training on Reliability (Subsea operations course), Houston and Perth DnV taken ownership of OREDA and conducted Houston based operator training course (Mark BP rep) OTC Session on reliability and integrity management On line diagnostics Integrity management IMecE meeting Positive feedback on 17N (multiple users operators and vendors and consultants) Discussion on inclusion on Integrity, integrate reliability and integrity 2