Preparation of D1.7. Massimo Sgaravatto INFN Padova. Introduction. D.17 Final evaluation report We should report (as we have been told): Achievements Fulfilments and deviations (explaining why) of the original plans Evaluation Future Directions. Proposed Outline.
E N D
Preparation of D1.7 Massimo Sgaravatto INFN Padova
Introduction • D.17 Final evaluation report • We should report (as we have been told): • Achievements • Fulfilments and deviations (explaining why) of the original plans • Evaluation • Future Directions
Proposed Outline • Introduction and executive summary • Summary of activities of WP1 in these 3 years • First WMS prototype • Review of WMS architecture and second release of WMS • Support and bug fixes • Activities within Iteam, ATF, QA, Security group
Proposed Outline • Achievements and evaluation • Summary of capabilities of the WMS • Some numbers on performance ? • Use of the WP1 software • WMS used in different environments, and not only in EDG (used by LCG, CrossGrid, Grid.it, …) • Contributions to standards • Activities within GGF • Grid Accounting • GridCPR activities • What else ? • Glue Schema activities • Papers for journals and conferences ? • We didn’t do a very good job here … • What else could we write for “evaluation” ? • Some performance numbers ? Which ones ? • Difficult to rely on evaluation criteria written in D1.2 (they were quite generic)
Proposed Outline • “Deviations” (Final results wrt what was initially planned in the TA) • What was not done (or was not deployed) but was planned and why ? • What was done even if not initially planned and why ? • What was done but was not deployed and why ? • Future work • See i.e. talks given by F. Prelz at INFN-GRID worksop in Catania • Going towards a Service Oriented (OGSA) architecture • Conclusions
Proposed schedule • Friday 14/11: first version ready for internal (WP1) review • I should basically write it, but I will ask contributions for some specific parts (e.g. participations to ATF, QA, …, activities within GGF) • Thursday 20/11: deadline for comments • Much better if comments can arrive earlier • 24/11/2003: D1.7 ready for internal (EDG) review • Moderator: J. Jensen (WP5) • Reviewers: • M. Corvo (WP8) • A. Terracina (WP9) • J. Montagnat (WP10) • 15/12/1003: PTB approval