presentsProject CrimsonApril 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams
Overview • Progress • Major Cost Items • Grading • Erosion Control • Storm Sewer System • Sanitary Sewer System • Water Distribution • Paving • Railroad • Total Cost
Progress Since Preliminary Report • Water Distribution System Design and Analysis • Sanitary Sewer Systems from Spec Building and Building on Site • Storm Sewer and Detention Pond for 100 Year Flood Event • Added Easier Fire Truck Access to the Building • Erosion Control • Fire Protection • Cost Estimate • Modified Elevations of Proposed Grading in Order to Cut Down on Net Cut and Fill Volumes
Grading • REC efficiently raised certain elevations on site in order to cut down on the amount of net cut • Grading Cost Items Include: • Clearing and Grubbing • Top Soil Stripping • Unclassified Excavation • Removing Unsuitable Material • Top Soil Replacement
Clearing and Grubbing: 2 acres Top Soil Stripping: 97,389 c.y.i.p. Unclassified Excavation: 7,008 c.y.i.p. Top Soil Replacement: 2 acres Removal/Stockpile Unsuitable Materials: 15,000 c.y.i.p $ 5,000 $ 438,250.50 $ 70,080 $ 4,040 $ 60,000 Grading Estimates
Silt fences and hay bales Necessary to prevent erosion on site during construction Protects adjacent properties from erosion damage Length of silt fence required: 14,800 l.f. Number of hay bales required: 30 bales Erosion Control
$ 445,770 $ 145,740 $ 211,140 $ 7,200 Pipes Curbs and gutters Drains and Inlets Manholes and Covers Detention Pond * included in excavation costs Storm Sewer System
Paving Costs • Includes all pavement for roads and parking lots Includes preparation of sub-grade Subgrade Preparation Cost: $97,500 Truck Parking and Roadway Employee Parking
Total Estimated Cost • Total Estimated Cost for Project Crimson: • $4,417,303.55 • Please refer to your handout for the complete cost estimate, unit prices, and amounts of each unit used on site.
Civil Engineers Tuscaloosa, Alabama