An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Scene setting for CAATS II Episode 3 - CAATS II Final Dissemination Event Carlos Regidor Isdefe CAATS II Brussels, 13 & 14 Oct 2009

  2. Presentation outline • Why CAATS II? • What is CAATS II? • What did CAATS II do? • How did CAATS II do it? • What will you learn today? Episode 3 - CAATS II Final Dissemination Event

  3. EC VGH, VMP (MAEVA, 2002) Eurocontrol OCVM, VDR (VALSUP, G2G, 2004) EC/ Eurocontrol (JPB) E-OCVM, VDR 2006 First Period (2006-2008) Second Period (2008-2009) SESAR Why CAATS II? EC, Debate Platform CAVA Concerted Action in Validation (late 90´s) Eurocontrol / FAA OCVSD (1998) Episode 3 - CAATS II Final Dissemination Event OCVSD: Operational Concept Validation Strategy document VGH: Validation Guideline Handbook VDR: Validation Data Repository VMP: Validation Master Plan

  4. Cooperative Approach to Air Traffic Services II CAATS II Project Data Coordination action focussed on the management, consolidation and dissemination of the knowledge gained in European ATM-projects • Budget 3.452.212 € • Duration: 3 years (from 06-11-2006 to 05-11-2009) • 12 partners Episode 3 - CAATS II Final Dissemination Event http://www.caats2.isdefe.es/

  5. ANSP’s Research & Consultancy Industry Universities Eurocontrol CAATS II Consortium Episode 3 - CAATS II Final Dissemination Event

  6. Project objectives • Development of an integrated approach towards ATM Research • Development of case based approach model and introduction in the E-OCVM • Safety Case • Human Factors Case • Environment Case • Business Case • Interaction and support to projects • Collaborate and cooperate with SJU Episode 3 - CAATS II Final Dissemination Event

  7. What is a Case? “Structured way to describe the impact of a given concept on a certain stakeholder group” Not only a process Not only a report Not only a repository Episode 3 - CAATS II Final Dissemination Event

  8. … Case Stakeholders 1 Environment Case 3 Business Case Safety Case Human Factors Case Study results 2 V1 V2 V3 Cases in the E-OCVM Episode 3 - CAATS II Final Dissemination Event V0

  9. Effort V0 V3 Maturity Case objectives Concept refinement Evidence generation Episode 3 - CAATS II Final Dissemination Event

  10. Integration ATM Needs Scope Feasibility Pre-Operational Operational V1 V2 V3 V0 V4 V5 CAATS II Case Transition Criteria Maturity Assessment Gather and assess ATM Performance needs Scope Operational Concept and develop Validation Plans Iteratively develop and evaluate concept Build, consolidate and test Industrialisation and Approval Implementation Episode 3 - CAATS II Final Dissemination Event

  11. Good Practices • Map activities of ongoing projects • • Map activities of ongoing projects Map activities of ongoing projects Human Factors Safety Environment Business Guidelines • Map activities of ongoing projects • • Map activities of ongoing projects Map activities of ongoing projects Human Factors Safety Environment Business 2 workshops Consolidated Guidelines Maturity Assessment Transition Criteria E-OCVM v3 How we did it Info from Existing EC Projects Relationships between Cases Episode 3 - CAATS II Final Dissemination Event

  12. What you will learn… • How to better: • understand the role of the Cases; • know how to develop the Cases; • describe the problems and solutions considering different points of view; • assess the maturity of your Project; • position your project in the Lifecycle; • describe your stakeholders’ needs; • define your Validation Approach; • plan and execute your validation Programme/ Project(s). Episode 3 - CAATS II Final Dissemination Event

  13. What´s next? Case presentations • Cases • Relationship between cases Questions allowed after each case presentation! General contents • CAATS II Approach • Explanation of the case • Guidelines • Application tips Episode 3 - CAATS II Final Dissemination Event