1 / 11

T-FLEX Workshop Roger Snoble, L.A. Metro Chief Executive Officer October 29, 2007

T-FLEX Workshop Roger Snoble, L.A. Metro Chief Executive Officer October 29, 2007. Los Angeles County Metropolitan Transportation Authority. Metro Orange Line – October 28, 2005. Orange Line Route Map. New Canoga Station and Parking (Dec. 2006). 3,825 Parking Spaces. Metro Orange Line.

dai
Download Presentation

T-FLEX Workshop Roger Snoble, L.A. Metro Chief Executive Officer October 29, 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. T-FLEX Workshop Roger Snoble, L.A. Metro Chief Executive Officer October 29, 2007 Los Angeles County Metropolitan Transportation Authority

  2. Metro Orange Line – October 28, 2005

  3. Orange Line Route Map New Canoga Station and Parking (Dec. 2006) 3,825 Parking Spaces

  4. Metro Orange Line • A 14.5 mile dedicated bus way running east and west across the San Fernando Valley • 14 Stations • 7 Park-n-ride parking lots • 3,825 parking spaces • Parallel Bike path • Off Board fare collection • All high capacity buses • And More!

  5. Metro Orange Line STATION STOPS – rail-like station shelters including amenities such as seating, art work, lighting, security CCTV cameras, ticket vending machines, bike lockers etc.

  6. Orange Line Ridership

  7. North Hollywood Lowe Enterprises – Perspective Orange Line Station Red Line Station

  8. Metro Gold Line Eastside Extension

  9. Metro Gold Line Eastside ExtensionProject Overview • 6 Mile Alignment • 1.7 Miles of Tunnel • 8 Stations (6 At-grade & 2 Underground) • Park & Ride Facility • Direct Connection to the Pasadena Metro Gold Line • $898.8 million • Opens in 2009 Gold Line Gold Line

  10. Metro Gold Line Eastside Extension Under Construction • Excavation of both tunnels was completed in December 2006 with no measurable surface settlement. • Construction of the two underground stations is underway.

  11. 1st & Boyle

More Related