WECCState of the Interconnection (SOTI) Report Matthew ElkinsSenior Economist March 13, 2013
WECC Business Objectives WECC’s business objectives, for the next three to five years, are as follows: • 1. Execute delegated authority with a high degree of excellence to reduce the frequency and severity of system events • 2. Facilitate the reliable and cost-effective integration of variable generation and non-traditional resources in the Western Interconnection • 3. Improve cost-effectiveness and efficiency of WECC processes to optimize the use of assessments • 4. Produce interconnection-wide studies to support the development of a reliable, robust transmission system and assure resource adequacy • 5. Identify and mitigate potential risks and vulnerabilities to improve system reliability • 6. Increase organizational readiness to respond to external drivers • 7. Provide data and analysis to support informed decisions related to system reliability and efficient competitive power markets
SOTI Objectives The SOTI Report objectives are as follows: • Provide an analysis of historical data as an indicator of the current state of the Western Interconnection • WECC Objective(s): 1. …reduce the frequency and severity of system events 5. Identify… vulnerabilities to improve system reliability 6. …respond to external drivers 7. …support informed decisions related to system reliability • Provide observations that help connect the state of the Interconnection today to the future • WECC Objective(s): 2. Facilitate the reliable…integration of variable generation and non-traditional resources 3. …optimize the use of assessments 4. …support the development of a reliable, robust transmission system and assure resource adequacy • Provide recommendations, where possible, for addressing threats to reliability and gaps in the data and analysis process
SOTI Sections of Analysis • Transmission Outages • Event Analysis • Standards Violations • Adequacy and Planning Margin • Generation Availability* • Misoperations* • Path Flow* • RC Directives* * - New Categories in 2012 SOTI
2011 SOTI High Level Points of Discussion www.wecc.biz/Planning/PerformanceAnalysis/Documents/2011_WECC_SOTI_Report.pdf
2011 SOTI - Transmission Outage Data • Historic Data (2008-2010) • Failed AC Substation Equipment Largest Contributor to Outage Duration
2012 SOTI Enhancements and Additions
2012 SOTI - Transmission Outage Data • Historic Data (2008-2011)
2012 SOTI - Generation Outage Data • Historic Data (2008-2011)
2012 SOTI – Sections Still to be Developed • Standards Violations • Misoperations • Path Flow • RC Directives
Matthew Elkins Senior Economist (801) 819-7657 melkins@wecc.biz Questions