1 / 41

POWER? One of the largest problems industry faces in the market today.

POWER? One of the largest problems industry faces in the market today. POWER? One of the largest problems industry faces in the market today. Is there an alternative to using the grid or generating on site?. POWER? One of the largest problems industry faces in the market today.

Download Presentation

POWER? One of the largest problems industry faces in the market today.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. POWER? One of the largest problems industry faces in the market today.

  2. POWER? One of the largest problems industry faces in the market today. Is there an alternative to using the grid or generating on site?

  3. POWER? One of the largest problems industry faces in the market today. Is there an alternative to using the grid or generating on site? What if the site’s grid connection is unstable?

  4. POWER? One of the largest problems industry faces in the market today. Is there an alternative to using the grid or generating on site? What if the site’s grid connection is unstable? What are we going to do when the Generator goes down Sunday morning in the dead of winter? Or when there is a brown out that shuts down your whole field?

  5. POWER? One of the largest problems industry faces in the market today. Is there an alternative to using the grid or generating on site? What if the site’s grid connection is unstable? What are we going to do when the Generator goes down Sunday morning in the dead of winter? Or when there is a brown out that shuts down your whole field? ENVIRONMENTAL?

  6. POWER? One of the largest problems industry faces in the market today. Is there an alternative to using the grid or generating on site? What if the site’s grid connection is unstable? What are we going to do when the Generator goes down Sunday morning in the dead of winter? Or when there is a brown out that shuts down your whole field? ENVIRONMENTAL? Ongoing pressure from the Government and International organizations and the public pushing you to reduce your “CARBON” and “GREENHOUSE GAS” emissions

  7. Is there a solution ?

  8. Is there a solution ? My partners and I with are happy to say. Yes there is.

  9. Patent Pending The revolution in GREEN RELIABLE power generation

  10. Patent Pending • The PowerStack • only exhaust driven patented power generation system.

  11. Patent Pending • The PowerStack • only exhaust driven patented power generation system. • enables you to power your facilities potentially with ZERO ongoing fuel costs.

  12. Patent Pending • The PowerStack • only exhaust driven patented power generation system. • enables you to power your facilities potentially with ZERO ongoing fuel costs. • free supporting, unattached system that works in conjunction with your new or existing facility.

  13. Patent Pending Here is a photo and short video of our first operational unit installed over a test compressor located south of Grande Prairie.

  14. Patent Pending Here is a photo and short video of our first operational unit installed over a test compressor located south of Grande Prairie. • Outputs: • Average 3.2 KW • Note: • 72% of peak for the system. • The compressor was running at 55%

  15. Patent Pending Here is a photo and short video of our first operational unit installed over a test compressor located south of Grande Prairie. • Outputs: • Average 3.2 KW • Note: • 72% of peak for the system. • The compressor was running at 55%

  16. Patent Pending Illustration of the installation for Skid mounted 10Kw PowerStack (to scale)

  17. Patent Pending Close up drawing of the installation for Skid mounted 10Kw PowerStack

  18. Patent Pending To quote a good friend of mine “ Dave You can’t get something from nothing!”

  19. Patent Pending • To quote a good friend of mine • “ Dave You can’t get something from nothing!” • taking advantage of the inefficiencies of the internal combustion engine. • using wasted energy that was converted to heat and velocity. • After all and engine is just an air pump.

  20. Patent Pending • How much power can the system put out? • That is directly related to the size of your driver.

  21. Patent Pending • How much back pressure will this put on my system?

  22. Patent Pending • How much back pressure will this put on my system? • OUR R&D test results show there is no more back pressure then a brisk crosswind that your system currently experiences.

  23. Patent Pending Can I sell the power back to the grid?

  24. Patent Pending Can I sell the power back to the grid? Yes you can when you are of course connected to the grid. The system qualifies for micro generation status*. And for a small admin fee we can look after that application for you. Or direct you so you can do this yourself.

  25. Patent Pending What are Carbon/ Green Credits?

  26. Patent Pending • What are Carbon/ Green Credits? • They are a serialized paper credit that are determined by several factors: • What technology are you replacing • The grid, Diesel, Natural gas • For every kw produced there is a formula to calculate its value. For every fossil fuel you are eliminating you will get credit. • You earn credits and they are worth money, either to add to your balance sheet or sell them as an asset, or to offset your own CO2 output • We have a professional company that calculates and handles the transactions for the Power Stack Units *Rules and restrictions apply, these can be found at www.auc.ab.ca under micro-generation

  27. Patent Pending What is my ROI?

  28. Patent Pending • What is my ROI? • Average 48-60 months * based on grid tied and supplemental use • This figure is calculated of the power savings alone. Not taking into account any of the following:

  29. Patent Pending • What is my ROI? • Average 48-60 months * based on grid tied and supplemental use • This figure is calculated of the power savings alone. Not taking into account any of the following: • Decreased down time • Decreased fuel used on off grid sites

  30. Patent Pending • What is my ROI? • Average 48-60 months * based on grid tied and supplemental use • This figure is calculated of the power savings alone. Not taking into account any of the following: • Decreased down time • Decreased fuel used on off grid sites • Dividends from carbon credits

  31. Patent Pending • What is my ROI? • Average 48-60 months * based on grid tied and supplemental use • This figure is calculated of the power savings alone. Not taking into account any of the following: • Decreased down time • Decreased fuel used on off grid sites • Dividends from carbon credits • Reduced operating costs

  32. Patent Pending • What is my ROI? • Average 48-60 months * based on grid tied and supplemental use • This figure is calculated of the power savings alone. Not taking into account any of the following: • Decreased down time • Decreased fuel used on off grid sites • Dividends from carbon credits • Reduced operating costs • And the hardest to quantify. Public image.

  33. Patent Pending Features • Generators • Axial Flux Permanent Magnet Generators. • TUV Nord Certified and US Military spec MLT-810. • 100% duty cycle.

  34. Patent Pending Features • Generators • Axial Flux Permanent Magnet Generators. • TUV Nord Certified and US Military spec MLT-810. • 100% duty cycle. • Electrical controls • CSA approved • Class1 div 2. (when installed in your existing MCC) • designed for 100% duty cycle.

  35. Patent Pending Features • Generators • Axial Flux Permanent Magnet Generators. • TUV Nord and US Military spec MLT-810. • 100% duty cycle. • Electrical controls • CSA approved • Class1 div 2. (when installed in your existing MCC) • designed for 100% duty cycle. • Tower • incorporate lifting lugs, fall arrest points and are hinged to enable fast safe inspections

  36. Patent Pending SO in conclusion 45 Innovations are offering you today is simple. An opportunity to be a true innovator in your industry. At the same time you get what you always need. STABLE

  37. Patent Pending SO in conclusion 45 Innovations are offering you today is simple. An opportunity to be a true innovator in your industry. At the same time you get what you always need. STABLE RELIABLE

  38. Patent Pending SO in conclusion 45 Innovations are offering you today is simple. An opportunity to be a true innovator in your industry. At the same time you get what you always need. STABLE RELIABLE GREEN

  39. Patent Pending SO in conclusion 45 Innovations are offering you today is simple. An opportunity to be a true innovator in your industry. At the same time you get what you always need. STABLE RELIABLE GREEN POWER

  40. Patent Pending Thank you. For more information Please call Dave Metituk 780 532 1156 Email dave@thepowerstack.com

More Related