1 / 21

AMI project for Israel Electricity Corporation

AMI project for Israel Electricity Corporation. Beeper- Larotech Ilan Friedland - CEO. Israel Electric Company - Background Information. Yearly income - 6.3B $ us Total no’ of consumers - 2.5 M Production capacity - 12,500 MW Electricity supplied ( sold ) - 57,145,000 MWh

dalton
Download Presentation

AMI project for Israel Electricity Corporation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AMI projectfor Israel Electricity Corporation Beeper-Larotech IlanFriedland - CEO

  2. Israel Electric Company - Background Information • Yearly income - 6.3B $us • Total no’ of consumers - 2.5M • Production capacity - 12,500 MW • Electricity supplied (sold) - 57,145,000 MWh • Average Unavailabilityper consumer/year - 132 minutes(exceptionally low) * IEC 2011 statistical reports

  3. USA - LargestUtilities IEC

  4. IEC AMI - Project Background • Israel Electric Corporation (IEC) decided to implement Smart Metering • Why smart metering? • Billing & Collection • Customer service Improvement • Demand Respond – peak shaving and production planning • Deployment in few stages • First stage : 8.5K Industrial customers(the largest AMI project in Israel) • Next stages: extend to 30K – 50K C&I

  5. Israel Electric Company – Larotech AMI Project Annual KWh Supply – Breakdown by Customer Type AMIPhase II 60% of Annual Income 3.8B$)) AMIPhase I

  6. Israel Electric Company - AMI Project ROI for AMI Project • 8,500 meters - 53% of total revenues • Large customers billing - ~250K $USper month • Project cost per year - 500 K $US • 2 faulty meter reading per month = AMI project cost per year • Customer service Improvement • Demand Respond – peak shaving and production planning

  7. AMI - Typical Architecture • Objectives: • Meter reading & management by either Web2MTM system users or third party servers • Monitoring and control of the communication infrastructure • Main Larotec’s system components: • Interface & Communication Units (ICU) interfaced to the meters • Communication Server – management of meter reading, communicationand asset management • The Web2MTM is integrated with additional system components: • Metering server: Reads the meters via the ICU • Radius Server: Responsible for the network IP assignment • GIS Server: displaying end device (ICU + meter) location and status on maps

  8. IEC AMI - Robust Architecture Industrial Meters Larotec’s ICU Fixed IP Comm. Server Private APN via GPRS Network Radius Server Metering Server reading success rate - 99.7%

  9. Web2MTM – Consumption Reports

  10. Web2MTM– Readings of Current value (1st phase)

  11. Web2MTM– Readings of Power Factor value

  12. Multiple operating modes • Transparent mode: • “Transparent Bridge” between 3rd party Metering Server and the system • Listening mode: • ICU waits for requests from the metering or communication servers while still performing its regular procedures • Command mode: • FOTA (firmware over the air) • Data on Demand • Configuration update

  13. Additional features for IEC project • Communication Management • Monitoring: • Cell ID: trackingthe active cell serving the ICU • Rx level: tracking level of GPRS Radio Frequency signal reception • Commands: • Get Data Now: enabling data acquisition at any required time • Activation: remotely enable/disable meter reading services • Communication parameters: Configure parameters on the fly from remote location • Remote s/w update • Templates: pre-defined profile assigned to any hierarchical group via the communication server

  14. Project Status - 2012 • 6,850 installations • Deployment – Nation Wide since 2010 • Meter Reading success – 99.7% • Data Collection Interval – 2 times per day • Meter Reading Interval – 15 min

  15. Why 2/3G for Smart Grid ?

  16. Why 2/3G for Smart Grid - Cellular Data Cost

  17. Why 2/3G for Smart Grid – Cellular Capacity

  18. Why 2/3G for Smart Grid – Total Cost Of Ownership

  19. Why 2/3G for Smart Grid - Technology Selection Consideration

  20. Why 2/3G Cellular for Smart Grid - Summery

  21. Thank You!