Detector Decommissioning Related Activities at DØ

Detector Decommissioning Related Activities at DØ. George Ginther Fermilab and University of Rochester. 2 March 2012. Recent Activities. Began nitrogen purge of VLPC cryostats on 23 January Collision hall radiation survey completed on 24 January Was previously posted as a radiation area

dalton
Download Presentation

Detector Decommissioning Related Activities at DØ

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Detector Decommissioning Related Activities at DØ George Ginther Fermilab and University of Rochester 2 March 2012

  2. Recent Activities • Began nitrogen purge of VLPC cryostats on 23 January • Collision hall radiation survey completed on 24 January • Was previously posted as a radiation area • Now posted as a radioactive materials area • Nitrogen Dewar 39 empty as of 26 January • Suspended LN2 delivery to dewar 42 as of 1 February • Powered down calorimeter test stand as of 9 February • Pond water pressure loss on 10 February • Requested variance for DAQ nodes to support monitoring of SMT annealing • Transition nodes to SLF5 (and Clued0) and shutdown of other nodes in progress • Refrigerant recovered from Trane chiller • York chiller seals being repaired

  3. Tours • During Collaboration meeting • For EDIT school • Re-using various components • 120 farm nodes moved to Clued0 • Helium purifier disconnected for NML CMTF • LN2 recapture system targeted for LAr35 • Portable dehumidifiers to SiDet • Preparing HV crate for MINERvA veto • Dryers and compressors for NOvA near detector APD purge • Relays, cables

  4. Solenoid

  5. VLPC cryostats cold block temperatures

  6. Purging the VLPC cryostats(Analysis and plot by Russ Rucinski)

  7. Liquid Helium Inventory

  8. Liquid Nitrogen Dewar 39

  9. Argon Storage Dewar

  10. Liquid Nitrogen Dewar 42

  11. Current Status • Helium inventory in gas storage tank • Solenoid coil currently at 266K and warming • Calorimeters warming up (and will be for many months) • Evaluating potential re-use of argon inventory • Suspended delivery of liquid nitrogen • Wipe at transfer line filter • VLPC cryostat purge continues • AFE readout still powered • SMT chiller at 16C • SMT readout in standby awaiting additional annealing measurements • DAQ running unrecorded zero bias in auto-pilot until next SMT annealing measurement

  12. As conditions (and resources) permit • Continue powering down rack infrastructure • Continue preparations of online computing cluster for transition to offline cluster • Identify, backup and archive critical information • Continue high bay preparations • Continue harvesting components for re-use • Continue preparations for basic exhibit • Shut down silicon chiller and purge system • Drain Deionized Chilled Water detector systems and purge • Secure halon fire suppression systems

  13. Clean Out and Harvest • The mechanical crew is well into the process of preparing the DØ Assembly Building high bay to accommodate MicroBooNE TPC assembly

  14. LAr 1 • 1 kiloton liquid argon membrane cryostat • About 16 times as much argon as used in DØ calorimeter cryostats