Converting PROSCAN CS to EPICS

Status. Converting PROSCAN CS to EPICS. Damir Anicic, Paul Scherrer Institute, Villigen, Switzerland For EPICS collaboration meeting 2008, Shanghai, 10-14 March 2008. What is PROSCAN?. Medical facility for tumor treatment First beam 01.12.2006 Patient treatment since 01.06.2007

damian
Download Presentation

Converting PROSCAN CS to EPICS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status Converting PROSCAN CS to EPICS Damir Anicic, Paul Scherrer Institute, Villigen, Switzerland For EPICS collaboration meeting 2008, Shanghai, 10-14 March 2008

  2. What is PROSCAN? • Medical facility for tumor treatment • First beam 01.12.2006 • Patient treatment since 01.06.2007 • GANTRY1 in operation • New OPTIS soon • GANTRY2 patients in 2009 • Experiment (PIF) area in use • In-house developed ACS CS • Conversion to EPICS in progress • Gantry1 operation and OPTIS tests during working hours • PIF on most nights/weekends • => No time to test EPICS available COMET: Compact Medical Therapy Cyclotron Diameter = 3.2 m, Weight = 90 t, Power-consumption = 300 kW, Superconducting Energy = 250 MeV Protons

  3. Facts • Project start 01.04.2007 • Delayed to 01.06.2007 because of GANTRY1 • One person for IOCs (drivers,templates,…), 100% • One person for DataBase, up to 50% • One person for Workstation applications, up to 30%

  4. Facts (2) • 104 Magnets • 54 Digital I/O • 1 Degrader • 22 „Digitizer“ • 91 Harps (profile monitors) • 88 Current measurements++ • 110 RPS (Interlock) • 7 Motors • 22 High Voltage Sources • 48 Vacuum devices - PLC • 284 COMET devices - PLC • 116 Virtual • 350 VME boards or IP modules on 21 IOCs

  5. How to migrate to EPICS • Keep naming conventions • Base on same principle (IOCs do simple I/O) • Make “workstation-apps” talk EPICS-CA • Adjust MEDM screens • Use existing EPICS drivers, implement missing • Create required templates • Implement driver-configs, substitution files • All data (templates/substitutions/driver-configs) in DB

  6. How to do that? • KISS-principle : Keep It Simple and Stupid • Just do it, simple and as fast as possible • Find time to test it (Saturday, 01.03.2008 first try) • Correct mistakes, implement what was forgotten and go to previous step unless all done and OK

  7. What has been done • 11 drivers • 3 record types • 4 genSubs • 50 MEDM adl files adjusted • 10 Applications converted to CA

  8. What has been done (2) • 52 templates • 365 driver configs • 1009 template substitutions • 35628 records created

  9. What happened on March 1st • Boot 20 EPICS IOCs (all but one) • One did not start, unplug one card, starts • Many wrong driver configs detected and corrected • No single digital I/O worked (driver config mix-up diagnosed) • We forgot to implement Waveform template substitutions (91), few added to test it • First try was declared a success

  10. What’s next • Second try end of March (probably) • Detect and correct any errors • We’ll try to get the beam up • On later trials • Convert other applications (Beam Allocator is crucial) • Do dummy-irradiations together with medical group • Switch to EPICS in Jun 2008 (?)

  11. That’s all Folks! We are all GENIUS!