1 / 5

Team 2: Advancement / Raising Money

Team 2: Advancement / Raising Money. Mark Hoeting Arkansas State University Dan Terrio Lewis and Clark College Doug Ruschman Xavier University Thomas Podles Loyola College in Maryland. Scenario. Fund raising is President Beverage’s top priority for the University

Download Presentation

Team 2: Advancement / Raising Money

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team 2: Advancement / Raising Money • Mark Hoeting • Arkansas State University • Dan Terrio • Lewis and Clark College • Doug Ruschman • Xavier University • Thomas Podles • Loyola College in Maryland

  2. Scenario • Fund raising is President Beverage’s top priority for the University • The Advancement staff was doubled to prepare for the fund raising including 8 developers and an IT Mgr for Advancement • Advancement thinks the mainframe is inadequate to support the campaign • IT disagrees and relations have deteriorated between the groups

  3. Assumptions • A current ERP system is operational • The Advancement Department does not understand what all options included in the current ERP • The project is approved but changes can (and should) be made • Ineffective senior leadership from IT

  4. The Assessment • We feel the project is laden with internal security and business continuity risks • A build mentality on compressed timeline • Total costs and long-term implications have not been considered. • Could produce detrimental relationships with donors

  5. The Plan • Apologize for IT’s role in the deterioration of the relationship between the two organizations • Demonstrate concerns about the current plan • Perform a needs and costs analysis in short order • This project is the organizations number one project so IT needs to proceed as such

More Related