An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Status Sept 20, 2004 Gunther Haller Stanford Linear Accelerator Center Manager, Electronics, DAQ & FSW LAT Chief Electronics Engineer haller@slac.stanford.edu (650) 926-4257

  2. Contents • Overview • Hardware • Tower Electronics Module (TEM) • TEM ASIC’s • Tower Power Supply (TPS) • Power Distribution Unit (PDU) • Global Trigger-ACD-Signal Distribution Unit (GASU) • Spacecraft Interface Unit (SIU)/Event Processor Unit (EPU) • Heater Control Boxes/Harness • Flight Software • Test-Stands • Testbed

  3. LAT Electronics FSW is an integral part of the data acquisition (DAQ) subsystem and is managed, budgeted, and scheduled as part of the DAQ subsystem TKR Front-End Electronics (MCM) ACD Front-End Electronics (FREE) TKR CAL Front-End Electronics (AFEE) 16 Tower Electronics Modules & Tower Power Supplies CAL Global-Trigger/ACD-EM/Signal-Distribution Unit* 3 Event-Processor Units (EPU) (2 + 1 spare) • Event processing CPU • LAT Communication Board • SIB Spacecraft Interface Units (SIU)* • Storage Interface Board (SIB): Spacecraft interface, control & telemetry • LAT control CPU • LAT Communication Board (LCB): LAT command and data interface Power-Distribution Unit (PDU)* • Spacecraft interface, power • LAT power distribution • LAT health monitoring * Primary & Secondary Units shown in one chassis

  4. TEM/TPS Mounted to CAL LAT GRID with 16 CAL/TEM/TPS Modules TKR not shown CAL TEM & TPS TEM TPS

  5. Tower Electronics Module EM Tower Electronics Module (TEM) before coating/staking • Main DAQ module, one on each tower • Controls and reads out data from TKR MCM and CAL AFEE front-end electronics • Zero-suppresses CAL event data • Buffers events in cable ASIC FIFO’s • Assembles CAL and TKR event fragments to tower event • Transmits data to GASU • Contains monitoring and low-rate science circuits • LVDS interface to front-end electronics and GASU GTCC1 & GCCC1 ASICs TEM Assembly • Status • Close to 60 TEM & TPS assemblies in the field used as EGSE for CAL, TKR, DAQ, FSW, I&T • All flight drawings released • Flight PCB’s fabricated • All enclosures fabricated • One flight PCB loaded at SLAC with flight-lot components for testing over parameter space; passed tests • Flight assembly contract in place • All components kitted and sent to assembler last week • Expect three assembled (Qual, Tower A, Tower B) enclosures at SLAC in November • Balance of flight production 2/05

  6. TEM ASIC’s • Two ASICs on the TEM • GLAST Tracker Cable Controller (GTCC) ASIC • GLAST Colorimeter Cable Controller (GCCC) ASIC • Function • TEM interface to tracker MCM’s or Calorimeter AFEE’s • Configuration and readback data • Trigger and event data handling • Data reformatting • Event buffers • First prototype design of both ASICs was production version • GTCC1’s • 398 tested • 384 good (96% yield) • 384 burned in, no failures (need 176 for TEM’s) • 192 flight GCCC1’s burned in, tested, no failures (need 88 for TEM’s) • GCCC1’s • 203 tested • 192 good (95% yield) • 192 burned in, no failures (need 88 for TEM’s) LVDS IO CORE FIFO GTCC1

  7. Tower Power Supply EM Tower Power Supply (TPS) before coating/staking • Tower Power Supply module, one on each tower • Input 28V • Generates low-noise voltages for • TKR (2.65V analog, 2.65V Digital) • CAL (3.3V analog, 3.3V digital) • TEM (3.3V and 2.5V digital) • TKR Bias (20V-140V programmable) • CAL (20V to 90V programmable) • Temperature sensors TPS Assembly • Status • Same as TEM since TEM/TPS are produced as modules

  8. Power Distribution Module (PDU) • Primary and redundant boards in one enclosure • Function • Receives 28V from spacecraft • Power conditioning • Contains switches to turn-on/off 16 TEM’s and 3 EPU’s • Monitoring of LAT temperatures • 5 PDU assemblies in the field used as EGSE for DAQ, FSW, I&T • All flight drawings submitted for review/release • Flight PCB’s requisition and PDU assembly Statement-of-Work in progress • All components ordered • Start of assembly planned for November • Delivery of Flight PDU 3/05 EM PDU (before harness routing) PDU Assembly

  9. GASU • Primary and redundant GASU DAQ and GASU Power Supply boards in one enclosure • Function • Global Trigger • Event-Builder • Signal Distribution/Fan-out/In • ACD Electronic Interface • 15 GASU assemblies in the field used as EGSE for ACD, DAQ, FSW, I&T • Flight PCB’s requisition and GASU assembly Statement-of-Work in progress • All components ordered • Start of assembly planned for December • Delivery of Flight GASU 3/05 EM GASU (before harness routing) Power Supply DAQ board GASU Assembly

  10. SIU/EPU EM SIB • 3 EPU’s (2 Primary/1 Redundant) & 2 SIU’s (Primary/Redundant) • Difference is • SIB in SIU has MIL1553 communication components to spacecraft loaded • Start-up boot code loaded in CPU is different from SIU and EPU • 5 cPCI SIU/PDU assemblies in the field for DAQ, FSW, I&T • Enclosure • PCI Backplane • Crate Power Supply Board • Storage Interface Board (SIB) • LAT Communication Board (LCB) • BAE Processor Board • Mechanical flight drawings released • Electrical flight drawings almost ready for review/release • All components ordered • Start of assembly planned for December • Delivery of Flight SIU/EPU 3/05 SIU/EPU Crate Assembly

  11. Heater Control Box and Harness • Heater Control Box • Function • Turn on/off power to VHCP heaters via SIU supplied control signals • Engineering Module used on ISIS and Testbed • Flight drawings in sign-off • Harness • Function • Interconnects electronics modules in LAT • Interface to spacecraft • Drawings in sign-off • Contract to be placed in 10/04

  12. Flight Software (FSW) • FSW is an integral part of the data acquisition (DAQ) subsystem • > 3 million configuration bits to configure system and to take event data properly • Majority of software is to configure & setup hardware (boot, TKR, CAL, ACD, DAQ trigger, event-builder, sub-system setup, etc) • Rest is filtering, data monitoring, health & safety, telemetry • FSW development follows an iterative model • Functionality is developed and tested against available Hardware • Incremental builds with more functionality • Major builds • EM1: supports single tower, single CPU (e.g. TEM-based test-stations) • EM2: supports multi-tower or GASU/ACD, single CPU (GASU-based test-stations, partial test-bed) • FU (Flight Unit): supports multi-tower, multi-CPU (full test-bed, LAT)

  13. FSW Releases • In addition to regular builds, FSW must provide two formal releases • ISIS (Instrument Spacecraft Interface Simulator) Build & Release • An integrated FSW and hardware package provided to Spectrum Astro (the Spacecraft manufacturer) to allow Spectrum to conduct integration work • The ISIS FSW supports:1553 command delivery, ancillary/attitude/time tone command processing, boot process and boot commands for SIU, science data interface, all telemetry types, and other functionality • Full LAT Build & Release • Complete set of 16 towers, GASU, full set of CPU’s • Used as test-bed for hardware and software development & test • To be delivered to I&T for full-LAT testing (Formal Release)

  14. FSW Layer Model (Post Boot) Applications Layer Charge Injection Calibration (LCI) Spacecraft Messages(LSM) Instrument Physics (LPA) Diagnostics Framework(LDF) Thermal Control(LTC) Instrument Manager(LIM) Watchdog(LSW) Housekeeping(LHK) File/Object(LFS) Abstract Communication Layer Basic Services Inter-task Communications System (ITC) Service Layer Command and Telemetry/1553 Service (CTS) LCB Service(LCS) Driver Layer 1553 Driver (CTDB) LCB Driver (LCBD)

  15. FSW Status • Flight Unit level coding is underway • FU peer review was held September 16, 04 http://www.slac.stanford.edu/exp/glast/flight/web/FSW_home.shtml • Development, Unit Test, Low-Level Integration During CYQ4 • Builds produced as needed to support I&T • SW Test Scripts underway, completion February 2005 • Dry runs of qualification tests start in January 2005 • Then, following a TRR, Formal Qualification Testing (FQT) begins April 2005 • FQT period ends 4/30/05

  16. EGSE: TEM-based Test-stands LCB: LAT Communication Board Transition-card: Trigger Module • Processor: Motorola Power-PC • Flight Software • PMCIA LAT Communication Board for • LAT Communication • Transition Board • Trigger • TEM DAQ Assembly • TEM Power-Supply Assembly • 28-V Supply Power-PC Processor Flight Software TEM DAQ Assembly Tower Power Supply Assembly (1.5V/2.5V/3.3V/ 0-100V/0-150V) 28-V Power Supply

  17. Test-Stand Summary • Includes TEM-based and GASU-based test-stands • Outstanding • 2 TEM/TPS for CAL • PDU’s for I&T

  18. Instrument Spacecraft Interface Simulator Heater Controls/Loads PDU GASU PDU Load Box Crate Tester Power Supply SIU Crate • (Shown before installation in rack) • ISIS to be delivered to Spectrum Astro as LAT simulator • Delivery in October • Contains • SIU • GASU • PDU with loadbox • Heater control box with load box • Flight Software

  19. Testbed • The Testbed is a complete “flight-like” Trigger and Dataflow system with simulated front-end inputs. • Purpose of the Testbed • Validate the Level 3 Filter • Validate Flight Software • Validate Trigger and Dataflow System • Eventually, passed to ISOC • Can be used to test on orbit scenarios • The testbed is the only place where all parts of the T&DF system are assembled in a test environment • The last line of defense for catching system-level problems • Status: assembled, tests are in progress

  20. The LAT Testbed (-z) 1 of16 TEMs EPU External Crate PDU SIU Power Feeds GASU RF Shield 1 of 2 Heater Loads 1 of 2 Heater Controls

  21. The LAT Testbed (+z) 16 TKR FES 16 CAL FES 8 ACD FES 1 Control FES 16 Tower Loads 11 FES Control PCs

  22. Issues • ACTEL FPGA’s (on TEM/GASU/PDU/DIB/LCB) • Investigations on-going into failures on MEC fabrication line. Considering using new UMC fabrication line FPGA’s instead (decision in November) • EEPROM (on SIB/CPU) • Investigations on-going into failures in EEPROM components • Have software work-around for SIB • Decision whether to use PROM on BAE RAD750 board instead of EEPROM by November 1 • ESD Sensitivity • ASIC’s have higher sensitivity (about 200V HBM) than desired. Need good ESD-sensitive handling

  23. Summary • TEM and TPS are in flight assembly • Rest of DAQ will be in flight assembly within 12 weeks • Software is working on flight unit release • Instrument Spacecraft Interface Simulator will be deliver to SC vendor next month • LAT Testbed assembled and in test