1 / 31

Detector R&D towards the Technical Design Report

This presentation outlines the progress and future plans for the SuperB detector design, including physics studies, background simulations, and technology development.

Download Presentation

Detector R&D towards the Technical Design Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Detector R&D towards the Technical Design Report DRD2TDR Francesco Forti University and INFN, Pisa SuperB International Review Laboratori Nazionali di Frascati November 12-13, 2007

  2. Scope • We have a SuperB detector concept based on Babar • Still, a significant amount of work is needed to turn this concept into a full detector design and write a Technical Design Report in about 2 years: • Physics studies to optimize overall detector geometry • Background studies to optimize Machine-Detector-Interface design, detector space-time granularity and verify radiation levels • Detector subsystem physics-engineering studies to produce a sound subsystem design • Technology development for some specific subsystem components to improve performance • For each subsystem this talk will try to report where we stand in this process and present the plans for the future • Including some indication of who’s doing the work F.Forti - DRD2TDR

  3. Outline • Computing • Backgrounds • Silicon Vertex Tracker • Drift Chamber • Particle Identification Detector • Electromagnetic Calorimeter • Instrumented Flux Return • Trigger, DAQ, Electronics • Manpower F.Forti - DRD2TDR

  4. Computing • Computing “in” the TDR will be based on Babar+LHC experience: solvable problem • Fully detailed Computing TDR may come even a bit later than the detector TDR • Computing “for” the TDR is instead essential from now to the TDR • Collaborative tools • Web, Code and document repository, Wiki, mailing lists, etc. • Simulation tools • Physics studies, Background simulation, Detector studies • Mostly used Babar-derived tools so far, but a more flexible and varied simulation infrastructure will be needed Bologna, Ferrara, Padova, Pisa, Torino, SLAC F.Forti - DRD2TDR

  5. Simulation tools used • Beamline and backgrounds • MAD: established FORTRAN code for beamline sim. • BDSIM: Geant4-based beamline sim. • G4-based magnet and detector sim. to track particles in detector volume • Geometry initially hardcoded. • Started using GDML = Geometry Description Markup Language • SuperB Detector and Physics • Generator level studies • Full G4 Babar simulation with minor geometry changes • Babar/Pravda/Trackerr fast simulations: • replace Babar tracker with simple conical-cylindrical detector • realistic fit with material, but no pattern recognition • Subsystem specific code • What next: • Develop a fast simulation tool based on Babar existing code, but allowing easy change of detector geometry and performance • Integrate with background simulation • Benefit from ILC developments F.Forti - DRD2TDR

  6. Background • Sources (a re-evaluation is needed for TDR) • Beam-gas: ok because of low current • SR fan: can be shielded (see IR talk) • Touschek: delicate, see next slides • QED cross section Frascati, Pisa, SLAC F.Forti - DRD2TDR

  7. Background sources • Radiative Bhabhas • Beamline and shielding design are paramount • Showering and backscattering extends to large radius Rate 100kHz/cm2 @ R=1.2 cm • Pair production • Low Pt make magnetic shielding effective • Issue for first layer of SVT • Rate 15MHz/cm2 @ 1.2cm 5MHz/cm2 @ 1.5cm Pt accept. @ 1.5 T , 1.2 cm ~Angular acceptance F.Forti - DRD2TDR

  8. Touschek Background • Intrabeam scattering produces Touschek particles all along the ring, depending on emittance and bunch volume • Beam optics and collimator setting essential in controlling this background • Two-step simulation: • estimate primary Touschek particles hitting the B.P. in the I.R. with dedicated code • track the particles in the detector volume with G4 simulation • New lattice and collimators VERY effective • Not an issue anymore • Need to be carefully verified with final design F.Forti - DRD2TDR

  9. Silicon Vertex Tracker • The Babar SVT technology is adequate for R > 3cm: use design similar to Babar SVT • Layer0 is subject to large backround and needs to be extremely thin: > 5MHz/cm2, 1MRad/yr, < 0.5%X0 • Striplets option: mature technology, not so robust against background. • Marginal with background rate higher than ~ 5 MHz/cm2 • Moderate R&D needed on module interconnection/mechanics/FE chip (FSSR2) • CMOS MAPS option • new & challenging technology: • can provide the required thickness • existing devices are too slow • Extensive R&D ongoing on 3-well devices 50x50um2 • Hybrid Pixel Option: tends to be too thick. • An example: Alice hybrid pixel module ~ 1% X0 • Possible material reduction with the latest technology improvements • Viable option, although marginal F.Forti - DRD2TDR

  10. 50x50 um2 pixels 90Sr/Y electrons 3x3 Cluster signal Landau MPV: 700 e- Noise ENC = 50 e- S/N = 14 Noise mV MAPS R&D Extensive R&D ongoing (and needed): • Fast readout architecture • Digital to analog xtalk • Architecture scalability (4k64K) • Pixel cell optimization • Increase S/N (1530) • reduce power dissipation x2 • Radiation hardness • Not fully qualified yet. Irradiation program • Mechanical issues • sensor thinning, module design, low mass cooling • Test Beam foreseen in Sep 2008 • Prototype MAPS module + striplets SLIM5 Collaboration F.Forti - DRD2TDR

  11. Radius, thickness, resolution • MAPS low mass solution would leave more flexibility for radius (ie background) and resolution • Hybrid pixels will force to use the smallest radius and/or better resolution • Striplets (same MAPS material) require larger radius, performance marginal • Technological solutions depend critically on L0 radius, thickness, resolution • Fast simulation studies for variousdecays have been performed • A full, more detailed reassessment is needed for the TDR. Dt resolution in Bpp decays vs L0 X0(%) 10mm resolution 5mm resolution BaBar • beam pipe material: 0.4% X0 • b. p. inner R 1cm, o.r. 1.1 cm • layer0 radii = 1.2, 1.5, 1.7 cm • material for L0 = [0.2-1.5] % X0 • hit resolution = [5-15] mm MAPS MAPS F.Forti - DRD2TDR

  12. Bergamo, Bologna, Milano, Pavia, Pisa, Torino, Trieste SVT Activities • Strong Ongoing R&D • MAPS sensor chip development • Fast readout architecture • Pixel cell optimization • Radiation hardness • Mechanical issues • sensor thinning, module design, low mass cooling • striplets module • Simulation studies ongoing • Strongly connected with machine design and backgrounds simulation • Optimize detector geometry and granularity • Explore alternative technological solution • Test Beam foreseen in Sep 2008 (and probably 2009) • Prototype MAPS module + striplets F.Forti - DRD2TDR

  13. Technology adequate, but cannot reuse BaBar DCH because of aging Faster gas and smaller cell would be beneficial Baseline: Same gas, same cell shape Some gas improvement possible (order 20%) Reducing cell dimension deteriorates resolution Carbon fiber endplates instead of Al to reduce thickness Backgrounds simulated, dominated by radiative Bhabhas Depend critically on shielding About 7% occupancy with current solution, could be reduced to 1.5% Options/Issues to be studied: Miniaturization and relocation of readout electronics Critical for backward calorimetric coverage Possibility of fast waveform sampling electronics for cluster counting Conical, Carbon fiber endplate Further optimization of cell size/gas Activities Complete background simulation Test different gas mixtures on small DCH prototype Use the Frascati Beam Test Facility (e+/e- up to 500 MeV) Drift Chamber Frascati, SLAC F.Forti - DRD2TDR

  14. Particle Identification Detector • DIRC Barrel • Working very well. Main limitation from background generated in SOB and aging of PMTs • Readout Options • SOB: Faster PMTs using the standoff box and water coupling • Smaller SOB: Multi Anode PMTs and fused silica coupling • No SOB: Focusing readout with Multi Anode PMTs F.Forti - DRD2TDR

  15. Focusing DIRC Projected performance Concept Focusing readout for DIRC very promising. R&D ongoing on the mirror and photon detector Tests on possible photondetectors F.Forti - DRD2TDR

  16. Forward/Backward PID option • Extending PID coverage to the forward and backward regions has been considered • Possibly useful, although the physics case needs to be established quantitatively • Serious interference with other systems • Material in front of the EMC • Needs space • cause displacement of front face of EMC Technologies • Aerogel-based focusing RICH • Working device • Requires significant space (>25 cm) • Time of flight • Need about 10ps resolution to be competitive with focusing RICH • 15-20ps already achieved. 10ps seems to be achievable, although not easy F.Forti - DRD2TDR

  17. PID activities Cincinnati, Hawaii, Ljubljana, Novosibirsk,Padova, SLAC • R&D activity ongoing on many items • Photon detectors (MCP, PMTs, SiPM): uniformity, fast timing, cross talk, aging • Beam test of long bar focusing DIRC correcting chromaticity effects • Low power, fast timing electronics • Radiators: aerogel, NaF • Plan to produce realistic prototypes • Test beams desired, but precise plans still in preparation • Possibility of parasitic SLAC beam test in 2008 • Other possibilities being explored • Simulation studies to fully assess the benefits of the forward PID F.Forti - DRD2TDR

  18. EMC • Barrel CsI(Tl) crystals • Still OK and can be reused (the most expensive detector in BaBar) • Baseline is to transport barrel as one device • Various other transportation options • Forward Endcap EMC • BaBar crystal are damaged by radiation and need to be replaced • Occupancy at low angle makes CsI(Tl) too slow • No doubt we need a forward calorimeter • Backward EMC option • Because of material in front will have a degraded performance • Use as a VETO device for rare channels such as Btn. • Physics impact needs to be quantitatively assessed • DIRC bars are necessarily in the middle • DCH electronics relocation is critical for the perfomance • Could be made with lead/scintillator fiber technology such as KLOE F.Forti - DRD2TDR

  19. Forward EMC crystals • Both pure CsI and LSO could be used in the forward EMC • LSO more expensive, but more light, more compact, and more radiation hard • Now LSO is available industrially • Cost difference still significant, but not overwhelming. • Use LSO as baseline • Gives better performance • Leaves PID option open • CsI option still open • in case of cost/availability issues F.Forti - DRD2TDR

  20. EMC Test beam preparation • LYSO Test beam foreseenin 2009 • Test crystal response • Mechanical support andeffect of dead material F.Forti - DRD2TDR

  21. EMC Activities Caltech, Perugia, Roma • R&D ongoing on many items: • Crystals • uniformity, yield, performance characterization, radiation hardness • work with multiple vendors to improve price and performance • Readout: • opimize photon detector, design robust mechanical mount • Beam Test • develop mechanical support, data acquisition • define beam location and time • Simulation ongoing to: • Detector layout optimization (geometry, dead material, mechanical support, etc.) • Assess physics case for backward calorimeter • Testbeam foreseen in 2009 for 5x5 LYSO array F.Forti - DRD2TDR

  22. Instrumented Flux Return • Use scintillator bars à la MINOS • FNAL-NICADD (produced the MINOS bars) contacted • Already provided some spares for R&D purposes • Technology established, but optimization is needed • Readout type: F.Forti - DRD2TDR

  23. Fibers and readout F.Forti - DRD2TDR

  24. IFR Activities Ferrara, Padova, Roma1 • Ongoing R&D Activities and studies: • SCINTILLATOR: • Shape, Number of fibers, time response, coating • WLS FIBERS: • diameter, dopant concentration, shape, response speed • Photodetectors: APD vs. geiger mode devices • cost effectiveness, S/N, time resolution, gain stability vs voltage and temperature, channell uniformity, aging • Readout electronics • ADC-TDC electronics (used for DIRC) vs Constant Fraction Discrimination-TDC • Plans for full system test • Detection efficiency, Time/space resolution • 2008 lab test with sources/cosmic rays • Beam test of a prototype module foreseen in 2009 • Simulation studies • Optimization of the detector layout (dimension of scintillator slabs, number of layers, ...) F.Forti - DRD2TDR

  25. Electronics and Trigger/DAQ • Electronics and TDAQ based on Babar model • Areas of R&D / Studies • Per-channel requirements and channel counts • Detector occupancy estimates • Level-1 trigger tracking improvements • Bhabha veto at L1 • Study of target L1-accept capacity (100kHz vs. 150kHz if not Bhabha veto) • Virtually dead-time-free DAQ, overlapping events and/or triggers • Queue modeling of the system • Applicability of a BaBar-physics-filter-type filter in SuperB L3 • Applicability of alternative approaches (such as the ones used in LHC experiments) • Clearly a major cost driver • Several interested individuals, but core group not yet formed • Significant engineering will be needed to arrive at TDR F.Forti - DRD2TDR

  26. Manpower • We are in the process of detailing the manpower needs to arrive at the TDR • Physicists, engineers, technicians • We estimate that a group of about 75 physicsts and about 30 engineers, technicians, and computing professionals would be required over the next 2 years to prepare the TDR • The SuperB community is large and active and should be able to take on this task: already about 30 physicists and 10 engineers are actively involved in detector R&D • More groups are joining and will join the effort if the project is approved • Some key roles, such as chief mechanical and eletrical engineer might require specific hiring F.Forti - DRD2TDR

  27. Conclusions and outlook • We have a very sound detector concept • The R&D required to arrive at a technical design report is well defined and in most systems has already started • This R&D can be completed in 2 years • There are backup solutions for technical and cost risks • It is possible to build a detector that will deliver the SuperB physics F.Forti - DRD2TDR

  28. BACKUP SLIDES

  29. Pair Background vs. Radius F.Forti - DRD2TDR

  30. Beam pipe • 1.0 cm inner radius • Be inner wall • ≈ 4um inside Au coating • 8 water cooled channels (0.3mm thick) • Power ≈ 1kW • Peek outer wall • Outer radius ≈ 1.2cm • Thermal simulation shows max T ≈ 55°C • Issues • Connection to rest of b.p. • Be corrosion • Outer wall may be required to be thermally conductive to cool pixels F.Forti - DRD2TDR

  31. Detector Layout F.Forti - DRD2TDR

More Related