1 / 14

E - 94 -107 RICH detector status report

E - 94 -107 RICH detector status report. - Why How Were we are. E-94-107 - High Resolution 1p shell Hypernuclear Spectroscopy F. Garibaldi, S. Frullani, J. LeRose, P. Markowitz, T. Saito. forward angle& very good PID

magee
Download Presentation

E - 94 -107 RICH detector status report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E - 94 -107 RICH detector status report • - Why • How • Were we are

  2. E-94-107 - High Resolution 1p shell Hypernuclear Spectroscopy F. Garibaldi, S. Frullani, J. LeRose, P. Markowitz, T. Saito forward angle&very good PID are needed to be able to get reasonable counting rates and unambiguous kaon identification in order to clean up the huge background

  3. Kaon Identification through Aerogels: p p k All events p k p AERO1 n=1.015 AERO2 n=1.055 KAONS = AERO1•AERO2 Hypernuclei -> smaller scattering angle -> higher background --> something else is needed

  4. RICH Contamination of pion and proton on the K signal with different PID systems, for the counting rates of two levels (10-2 Hz and 10-4 Hz) without RICH with RICH 0

  5. Cosq =1/nbDb/b = tg Dq N = p.e. per ring Dq D q /sqrt(N) • n fixed by the momentum(2GeV/c) • C6 F14, transparent down to 160 nm • - compact (~ 50 cm) • relatively thin (18% X0) • 310 x 1820 mm2 • quarz window 5 mm 15 mm 300 nm

  6. Many parameters affect the detector performances (# p.e.) • quartz transparency in the v.w. region of interest (160 - 220 nm) • freon purity to not absorb the emitted Cherenkov light • freon purity circuit + continuously monitoring • CsI photocathode • - evaporation + on line QE absolute measurement • QE is strongly affected by oxygen and moisture • Careful handling of photocathodes after evaporation • Continuous monitoring of gas “purity”

  7. PD 3

  8. 2200 V G~ 2.5 x 105 A0=26 Jlab Cosmic tests June 03 Extrapolating to q=0 and taking into account the geometric inefficiency and false triggers (cosmics): > ~ 12 p.e. (as at CERN) Probably underestimated (protons below threshold, random coincidences etc.)

  9. The detector has been tested succesfully at CERN Novembre 2000(12 p.e.(14-15 with CH4))2 photocathode evaporated respectively at CERN and ROME ---> same result ! (the best CERN had obtained with the same gas mixture) • Neverthless increasing HV (2100 to 2200V) • gain back • p.e 10-12 (very difficult to estimate with cosmic, conservative) • Fixing freon leakage ==> 12-14 p.e. • (look at possible moisture contamination!) detector ready end ofJuly • spare radiator • spare f.e. electronics • 3 spare radiators to be evaporated by end of July • After trasportation, mechanical problems(a. w. to photocatode distance) • lower gain --> lower # p.e. (Difficult to measure, difficult to fix) fixed July 2002 • right gain back, but • wait for freon • Radiator accident • Fixed, but still some leak ->quench • --> lower gain (lower #p.e.) Slow control status to be checked (kaon meeting should be good (Jlab task) DAQ integration (see Bodo) Software - C++ code written by Guido being tested with CERN data for comparison with CERN (report next kaon mee. - improving the tracking (minimizing the angle error) using FPP?

  10. Conclusions • Detector ready to be installed when needed • decision driven by Hall A installation schedule • (eventual “last” evaporation not to be anticipated) • only test missing: hight rate behaviour on Jlab beam • the CERN experience (the only one available) says that we should not have problem but no tests are possible with a continuous beam)(type of problem: charging up of photocathode (CsI)) • F.Piuz (Pilos proceedings): 24 hours with 6.4X10-10 Coulomb/mm2/s • - in our case (Hall A, our experiment at 250 KHz we have 2 x 10-13 coulomb/mm2/s