1 / 9

Duncan Sharp

My Route To Gaining MCS Accreditation. Duncan Sharp. Scottish Energy Installers Alliance. How to get the skills to become an MCS Approved Contractor. Skills & Certification. Microgeneration Certification Scheme. Choosing a certification body Scope of microgeneration technologies

danika
Download Presentation

Duncan Sharp

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. My Route To Gaining MCS Accreditation Duncan Sharp

  2. Scottish Energy Installers Alliance How to get the skills to become an MCS Approved Contractor Skills & Certification

  3. Microgeneration Certification Scheme

  4. Choosing a certification body • Scope of microgeneration technologies • Hold the relevant Qualification • Trained to carry out the installations • Application • Assessment • Office assessment • On site Assessment • Surveillance visits • Certification Gaining MCS approval www.microgenerationcertification.org

  5. www.realassurance.org.uk • The Code sets out the standards applicable to the selling or leasing of small-scale heat and power generators, whether from renewable or other low carbon sources, to domestic consumers clear information on the systems planned and their performance • acceptable sales and marketing techniques • arrangements for installing and connecting the system • the selection and quality of goods supplied • details of the conditions of business that apply • the standard of any installation and other on-site work • guarantees, and any maintenance and after-sales services needed • what action will be taken to deal with any problems, and • arrangements for monitoring and continuously improving the Code

  6. Quality Management System (REAL Assurance ) Company Responsabilities ( Nominee) Internal Reviews Corrective / Preventative Actions Document Control External Documents Software control Contracts and Customer requirements Purchasing Documentation

  7. Microgeneration Installation Standards MCS 001 • Installer Certification Scheme Requirements • Microgeneration Installation Standards MIS 3005 • Requirements for installers undertaking the supply, design, of microgeneration installation , set to work commissioning and hand over of microgeneration heat pump systems Reading Material

  8. Sub-contracting Inspection of goods received Control of work in Progress Test and measurement equipment Storage, handling, packaging and transportation Records Complaints Training and competence Health and safety Documentation

  9. Questions

More Related