An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. City of BendWater Treatment Advisory GroupPresent Worth Cost Comparison Membranes VS. UV Disinfection

  2. 20-Year Present Worth Cost Assumptions • 6% rate • UV - Revised Capital Cost Estimates • 5% Contingency Added to Membrane Alt A and Alt B • Added diversion storage to membrane option – needed post fire • Adjusted UV contingency for common elements • WWTP treatment costs not included for membrane option • Revised power cost projection – see chart • UV Power Consumption – 500,000 kWh/Year • New wells constructed to provide 12.5 mgd reliable capacity during high turbidity @ $1.3/gallon capital cost • Wells operated 25% of time - turbidity events • Wells - 600 ft TDH average • Well pump efficiency 80% • Labor cost 2 people @ $31/hour – wells and UV

  3. Revised Capital Cost Estimate - Membranes

  4. Revised Capital Cost Estimate - UV

  5. Revised Electrical Power Cost ProjectionMid Columbia Wholesale Power Price Forecast6th Northwest Power Planning Council

  6. Membranes Vs. UV20-Year Present Worth Cost Comparison * Started at $502,000 per year (city number) and escalated at 3 percent per year. UV/well O&M, less power costs, also escalated at 3 percent per year

  7. What Happens With Fire? • Membrane System Costs include alternatives to allow some pretreatment but not post-treatment. Potential taste and odor issues even with pre and post treatment • UV System would be abandoned. 12.5 mgd of wells would increase operation from 25% of time to 100% of time. No taste and odor issues. • Abandoned cost is approx. $3 million

  8. Post Fire Membranes Vs. UV20-Year Present Worth Cost ComparisonWorst Case – Catastrophic Fire Immediate Post Construction

  9. Conclusions • UV plus 12.5 mgd of wells meets LT2, protects public health, • Approx. $10 million lower 20-year PW Cost, • Provides more capacity, • More reliable • If catastrophic fire – use wells 100% of time. • Still lower PW cost • No post fire water quality impacts