1 / 19

City of Dayton Water Supply and Treatment Division

City of Dayton Water Supply and Treatment Division. Water Supply and Treatment Division Mission & Goals. Mission : Provide abundant high quality water at an affordable price while maintaining and protecting the integrity of our natural resources. Goals: Protection of Source Water

hansel
Download Presentation

City of Dayton Water Supply and Treatment Division

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. City of Dayton Water Supply and Treatment Division

  2. Water Supply and Treatment Division Mission & Goals Mission: Provide abundant high quality water at an affordable price while maintaining and protecting the integrity of our natural resources. Goals: Protection of Source Water Water Treatment Sufficient Quantity & Pressure for Fire Fighting Protection of Public Health

  3. Dayton Water Facilities • 3 Well Fields • 2 Water Treatment Plants • 1 Lime Recycling Plant • 2 Main Pumping Stations • 11 Booster Pumping Stations • 16 Water Storage Facilities - 88 MG •  We pumped over 20 Billion Gallons of Water in 2009 •  We supply water to >400,000 Montgomery County residents

  4. Ottawa Water Plant

  5. Miami Water Plant

  6. Lime Recycling Plant - Recovers lime softening residuals from water plants & produces pebble lime

  7. Basic Water Treatment Process

  8. Aquifer Contamination

  9. Well Field Protection Areas

  10. Mad River Well Field – Rohrer’s Island

  11. Miami WTP Softening Basins

  12. Rapid Sand Filters

  13. Miami WTP - South Pump StationOne of two pumping stations

  14. Dist. System Maintenance & Protection • 750 Miles of Water Mains • Storage Facilities and Pumping Stations • Hydrant Flushing • Automatic Flushers • Tank/Reservoir Inspections • Valve Exercising • Main Replacements • Main Break Repair • Backflow Prevention • Water Testing

  15. Water Sampling and Testing

  16. Water Sampling

  17. Water Quality Laboratory

  18. Maintenance Work & WaterTesting at Water Plants

  19. The City of Dayton pumped over 20 billion gallons of treated drinking water to Montgomery County residents and businesses in 2009.For more information: (937) 333-6093 or phil.vanatta@cityofdayton.org

More Related