120 likes | 306 Views
Subregional Planning Group (SPG) Coordination Group (SCG). Scenario Planning Steering Group (SPSG) Susan Henderson – SCG Rep June 17-18, 2010. * BCTC is not a WECC TEPPC designated SPG. BCTC is actively involved in regional transmission planning process and is a SCG member. *BCTC*
E N D
Subregional Planning Group (SPG) Coordination Group (SCG) Scenario Planning Steering Group (SPSG) Susan Henderson – SCG Rep June 17-18, 2010
* BCTC is not a WECC TEPPC designated SPG. BCTC is actively involved in regional transmission planning process and is a SCG member *BCTC* BRITISH COLUMBIA TRANS. CORP AESO ALBERTA ELECTRIC SYSTEM OPER. SCG Members * BCTC is not a WECC TEPPC designated SPG. BCTC is actively involved in regional transmission planning process and is a SCG member
SPG Coordination Group (SCG) • Formed to: • Foster coordination between the SPGs • Assist WECC in developing it’s 10-year plan • Ad-hoc Group • Charter approved 4-21-10 • Purpose • Mission • Membership • Voting • Organization
Subregional Planning Group (SPG) Primary Role • Preparing a “Foundational Transmission Projects List” that WECC can use a starting point for their 10-year plan. • The “Foundational Transmission Project List” will not provide sufficient transmission additions for the 10-year time frame • Need to know where new resources (supply or demand side) will be located before a complete transmission plan can be developed • WECC will build on SCG foundation to meet resource policy goals and mitigate congestion • WECC may also remove or change projects that are in the SCG list • The SCG will also provide a list of “Potential” Projects that WECC can utilize to integrate resources and mitigate congestion
FOUNDATIONAL PROJECTS BY 2020 • NTTG • NTTG01 Gateway South Phase 1 • NTTG02 Gateway Central Phase 1 • NTTG03 Gateway West Phase 1 • NTTG05 Hemingway – Boardman • NTTG06 Cascade Crossing • CG • CG01 I-5 Corridor • CG02 West McNary • CG03 Big Eddy – Knight • CG04 Little Goose Area Reinforcement • BCTC • BCTC01 Nicola – Meridian • BCTC03 BC-US Intertie • Alberta AESO • AESO03 1202L Conversion • AESO04 Heartland • AESO05 West HVDC • AESO06 East HVDC • AESO07 Fort McMurray - East Line • AESO08 Fort McMurray - West Line • CAISO • CAISO02 Sunrise • CAISO03 Bylthe-Devers • CAISO04 Tehachapi • SSPG • SSPG02 SWIP South • SSPG06 TCP Harry Allen - Northwest • SSPG07 TCP Northwest – Armagosa • SWAT • SWAT01 PV-NG#2 • SWAT06 Pinal Central – Tortolita • SWAT07 Southeast Valley (SEV) • SWAT08 PV - Morgan • CCPG • CCPG02 Pawnee – Smoky Hill • CCPG03 Waterton- Midway • CCPG04 San Luis Valley Alberta AESO07 British Columbia AESO08 Heartland AESO03 AESO04 AESO06 Ellerslie Genesee AESO05 DRAFT Langdon Nicola Meridian West Brooks BCTC01 Ingledow BCTC03 Custer Washington Montana CG04 CG02 Castle Rock Monumental Lower Ferry CG03 Townsend Big Eddy CG01 Knight Troutdale McNary Coyote Spgs John Day Bethel NTTG06 Boardman NTTG05 Idaho Oregon Hemingway Midpoint Wyoming NTTG03 Populus Aeolus NTTG03 Bridger NTTG02 NTTG01 Terminal Pawnee Oquirrh CCPG02 Limber Nevada Mona Robinson Smoky Hill Waterton NTTG01 CCPG03 Sigurd Midway SSPG02 California Legend Utah Colorado Red Butte Amargosa SLV Comanche SSPG06 500 kV Single Circuit Line 345 kV Single Circuit Line 500 kV Double Circuit Line 345 kV Double Circuit Line DC Circuit (various voltage) Termination Substations Intermediate Substations CCPG04 SSPG07 Highwind Harry Allen Northwest CAISO04 Antelope Windhub Eldorado Arizona Vincent Pardee Morgan SWAT08 Devers Bylthe Browning CAISO03 New Mexico SWAT07 SWAT01 Peňesquitos Imperial CAISO02 Palo Verde Pinal Central North Gila II SWAT06 Tortolita Draft Document - Ver. 4.1, May 24, 2010 (1) Map does not reflect 230kV lines that are included in the Foundational Transmission Project List. (2) Internal reinforcements projects not shown for clarity. (3) Lines shown are for illustrative purposes only and may not reflect final line routing.
POTENTIAL PROJECTS BY 2020 • NTTG • NTTG01 Gateway South Phase 2 • NTTG02 Gateway Central Phase 2 • NTTG03 Gateway West Phase 2 • NTTG04 Hemingway-Captain Jack • NTTG07 MSTI • NTTG08 Chinook • NTTG09 Zephyr • NTTG10 Overland • NTTG11 Transwest Express • NTTG13 Colstrip Upgrade • CG • CG05 Juan De Fuca Cable #1 • CG06 Juan De Fuca Cable #2 • CG07 West Coast Cable • BCTC • BCTC02 CNC including Devils Gap • Alberta ESO • AESO02 Northern Lights • CAISO • CAISO01 C3ET • SSPG • SSPG01 SWIP North • SSPG03 SNIP • SSPG04 Harry Allen – Eld/Mead • SSPG08 Blackhawk - Amargosa • SWAT • SWAT02 PV-Colo. River • SWAT03 Navajo Transmission Project • SWAT04 SunZia • SWAT05 High Plains Express • CCPG • CCPG01 WCI • CCPG05 Lamar Front Range • CCPG07 Pawnee - Daniels Park • CCPG08 Pawnee – Story Alberta British Columbia Edmonton DRAFT Selkirk AESO02 BCTC02 CG05 CG06 MidC Washington Montana NTTG013 Townsend NTTG07 Buckley CG07 Oregon Idaho Hemmingway Midpoint Captain Jack Wyoming Windstar Populus NTTG04 NTTG10 Aeolus NTTG03 Bridger SWAT05 LRS NTTG08 Terminal CCPG 08 Nevada NTTG01 CCPG 01 BCTC02 NTTG02 Wray Limber Pawnee SSPG 01 NTTG11 CCPG 07 NTTG09 Blackhawk Mona Story Daniels Park Robinson SSPG08 Sigurd CCPG05 Missile Site NTTG01 California Legend Colorado Boone Comanche Collinsville Amargosa Red Butte Lamar Utah 500 kV Single Circuit Line 345 kV Single Circuit Line 500 kV Double Circuit Line 345 kV Double Circuit Line DC Circuit (various voltage) Termination Substations Intermediate Substations Gregg Vilas Harry Allen Crystal CAISO01 Gladstone Red Mesa Mead Shiprock Marketplace New Mexico SWAT03 Moenkopi Midway Eldorado Arizona Springerville Blackwater Corona Colo. River SWAT02 SunZia East SWAT05 Palo Verde Pinal Central SunZia Midpoint SWAT04 (1) Map does not reflect 230kV lines that are included in the Foundational Transmission Project List. (2) Internal reinforcements projects not shown for clarity. (3) Lines shown are for illustrative purposes only and may not reflect final line routing. Draft Document - Ver. 4.1, May 24, 2010
How the SCG Selected the Projects • Screened projects for regional significance based on voltage level • All proposed 500 kV and higher projects • 345 kV projects unless the project is deemed not to be a backbone facility • Projects above 200 kV that are deemed to be backbone facilities • Applied criteria to screened projects to assess the level of certainty of project construction
Foundational Transmission Project List Criteria • Must Meet at least one of the following: • Sponsor is required to build project to reliably serve load or to meet firm commitments for transmission service, or • Project is necessary to integrate WECC LRS Class 0 or Class 1 resources, or • Project sponsor(s) has a firm commitment to fund project construction. • SCG is currently using eleven indicators, including: • Are major equipment orders placed? • Is permitting actively underway or completed? • Are there executed project participation contracts?
Open Process and Meetings • Materials available on the WECC website • Go to: Committees>TEPPC>SCG>Documents, for: • Approved Charter • Go to: Committees>TEPPC>SCG>6/15/10 meeting > Meeting Materials, for: • Draft Criteria • Draft Report • Draft Major Projects Matrix • Draft Maps • Final “Foundational Transmission Projects List” and report scheduled to be complete by the end of June • Next Meeting September 29-30 in SLC
Other SCG Activities • SPG’s will remain active in the various WECC groups to support the development of the WECC Plan • Working to synchronize SPG planning processes with each other and WECC • SPG’s will complete reliability analysis of the WECC Plan • Planned to be initiated after WECC completes their 10-year plan • Probably will be completed by the SPGs as part of their normal reliability assessment cycles