WestConnect Subregional Planning Groups • CCPG and SWAT act as WestConnect technical planning work groups for WestConnect planning area • Coordinate Base Cases for use by all study participants • Define subregional study plans, provide study resources, and perform studies • Provide forum for coordination and peer review of planning studies and 10-year plans CCPG SIERRA ColoradoCoordinatedPlanningGroup New Area ? SWAT SouthwestAreaTransmission TEPPC 031408Mtg
2007 WestConnectSubregional Planning Participants • 13 WestConnect Project Agreement for Subregional Transmission Planning Members • 15 Other Participating Utilities • 15 Governmental Entities • 29 At large Industry Participants TEPPC 031408Mtg
Status of WestConnectSubregional Planning Process • 2007 Planning Cycle concluded • Annual Planning Meeting 1/17/08 • Ten Year Plan and Planning Report approved by Planning Mgmt Comm / Steering Comm • 2008 Planning Cycle has commenced • 2013 & 2018 Base Case being coordinated • Annual Adequacy Study of Plan this summer • Biennial Long Range Study conclude in 2009 • SWAT and CCPG will oversee Other Studies TEPPC 031408Mtg
WestConnect Annual Adequacy Study • Purpose – test the adequacy of most recently published WestConnect Transmission Plan (excluding conceptual projects) • A WestConnect-wide study utilizing the 5th and 10th year coordinated base cases • Perform traditional N-0, N-1 and N-2 contingency outages • Establish reliability risk of potential corridor outages with planned transmission projects in 10th year • Complete studies by August joint CCPG/SWAT meeting • Deficiencies in plan noted with sufficient lead time for subregional planning participants to investigate solutions for inclusion in the 2008 WestConnect Transmission Plan TEPPC 031408Mtg
WestConnect Biennial Long Range Study • Purpose – Biennially explore conceptual long range transmission needs within WestConnect Planning Area. • A Westconnect –wide study of contemporary issues facing the industry in the 10th year and beyond. • Utilizes the 10th year coordinated base case with load forecasts and generation scenarios representative of the study time period. Study limited to power flow and only considers N-1 outages. • Initial study has two fold objective: • Provide traditional transmission reliability oriented studies in response to the TEPPC economic transmission study results, • Study WestConnect-wide integration of renewable energy projects • Complete initial study in 2009 TEPPC 031408Mtg
Colorado Energy Resource Zones TEPPC 031408Mtg
NM Wind Collector System Integrated with HPX TEPPC 031408Mtg
Conceptual Transmission for Renewables TEPPC 031408Mtg
2008-2017 Plan Summary TEPPC 031408Mtg
Figure 2 – Cost Distribution by Voltage Class 2008-2017 Plan Cost TEPPC 031408Mtg
Planned Projects by Year TEPPC 031408Mtg
Conceptual Projects by Year TEPPC 031408Mtg
Planned Projects by State TEPPC 031408Mtg
Conceptual Projects by State TEPPC 031408Mtg