An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LTPP Lessons Learned:Kansas SPS-2 July 17, 2013 Abilene, KS Gabe Cimini Database Manager, LTPP NRSC

  2. Kansas SPS-2 Lessons Learned Overview • How are the Sections Performing? • Construction Related Performance Issues • What Lies Ahead?

  3. Kansas SPS-2 Lessons Learned Overview • SPS-2 experiments examine effects of climatic region, subgrade soil and Traffic rate on doweled jointed plain concrete pavement • Structural factors include drainage, concrete thickness, base type, concrete flexural strength and lane width • Requires that all test sections be constructed with perpendicular joints at 4.9 m spacing and stipulate a traffic load level in the lane in excess of 200,000 ESALs per year • The Climate for this SPS-2 project is considered to be a dry, freeze environment by LTPP definitions • Construction began January 1992 • Construction completed July 1992

  4. How are the Section Performing? • Maintenance and Rehabilitation over time • Longitudinal Cracking over Time • Transverse Cracking over Time • Roughness over Time • Pavement Deflections over Time

  5. How are the Section Performing? Overview of Maintenance/Rehabilitation Treatments

  6. Longitudinal Cracking

  7. Longitudinal Cracking

  8. Transverse Cracking

  9. Transverse Cracking 200202

  10. Roughness

  11. Roughness

  12. Pavement Deflections

  13. Construction Related Performance Issues • Construction delayed due to an extremely wet and rainy season • Type C flyash was used to help “dry-up” and stabilize the subgrade • Contractor experienced many problems trying to place the PATB. Trimming was often required to obtain the desired thickness • Several sections have PCC thickness that exceed the allowable tolerance of ¼ inch

  14. Construction Related Performance Issues (cont.) • Several underground structures exist within the limits of the test sections • 18 inch median drains located 5 feet or more below • Box culverts – 200204, 200208, 200209, 200211 • Transverse Drain located in Section 200210 • Median drain 4 feet below surface in Section 200211 • Vertical curves exist within the limits of the test sections

  15. Overview of Performance • More maintenance/rehabilitation treatments were required for sections with No Drainage • Sections with Drainage reported less cracking and lower maximum wheel path faulting as well as lower initial deflections with more sections performing better over time. • Maintenance/rehabilitation treatments were effective at reducing cracking and faulting values

  16. What Lies Ahead? • LTPP monitoring to continue • Potential for SPS-2 Pavement Preservation Pooled Fund Study • FactSheets available for Sections • Data available on InfoPave

  17. Factsheets

  18. Factsheets

  19. LTPP InfoPave

  20. LTPP InfoPave  Explore/Search/View data (Sitemap/Features) Select what you need (Data Bucket) Download what you have selected   LTPP InfoPave brand represents a complete body of knowledge and not just data.

  21. LTPP InfoPave LAUNCH: TRB 2014

  22. Questions?

More Related