1 / 51

WISDOT Mega Projects Lessons Learned

WISDOT Mega Projects Lessons Learned. Ryan Luck P.E. Speaker 2 Name Speaker 3 Name. Lessons Learned Owner’s perspective. To Reduce Cost over runs Schedule delays To Enhance Safety Constructability Quality. Mitchell Interchange. 27 th Street U-Ramps.

polly
Download Presentation

WISDOT Mega Projects Lessons Learned

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WISDOT Mega ProjectsLessons Learned Ryan Luck P.E. Speaker 2 Name Speaker 3 Name

  2. Lessons Learned Owner’s perspective To Reduce • Cost over runs • Schedule delays To Enhance • Safety • Constructability • Quality

  3. Mitchell Interchange

  4. 27th Street U-Ramps

  5. Mitchell Interchange – Tunnels

  6. Tunnels - Structural Interface

  7. Tunnels – Drilling Guides

  8. Tunnels – Secant Shafts

  9. Tunnels – Drilling Equipment

  10. Tunnels – Secant Shafts

  11. Tunnels

  12. Tunnels - Excavation

  13. Tunnels – Beam Erection

  14. Tunnels

  15. Tunnels – Secant Shafts

  16. Tunnels – Temporary Connections…..

  17. Tunnels – Lighting

  18. Tunnels – Completed

  19. Mitchell Interchange • 14 Bridges - Includes 3 tunnels • 29 Retaining Walls • 44 Sign Bridges • 7 Noise Barriers • 1,375,000 CY of Common Excavation • 10 miles of mainline and system ramps

  20. Design Level of Complexity Correspondence: Items Logged

  21. Lessons Learned Owner’s perspective Interface and integration is the key: • Structures (size, type, procurement) • Roadway (access, grading, drainage) • Storm sewer (depth, temp connections) • Electrical systems (aesthetics, plans) • Utilities (new vs. old, relocated, as-builts) • Preliminary stage work (season, quality) • Weather (markings, stage changes)

  22. Program Delivery: IPD - BIM Building Information Modeling (BIM) • Collaboration • 3D Visual • Prefabrication • Improved Design Documents • Quantity extraction • Visual scheduling • Phasing Plans • Coordination • E-Turnover/Archives

  23. Use of 3D design for integration “clash” detection • Quality Control – Tool • Clash Detection, Reveals Interface Issues • Reduce Project Risk – Cost/Schedule • CPM Schedule - Near Critical Tasks – Cascading Impact • Visualization Tool • Public, Stakeholders • Technical – • Contractor/Engineer • Utilities

  24. Tunnels – Building Information Modeling (BIM)

  25. Tunnels – BIM

  26. Integration Example Structures & Landscaping

  27. Integration Example Structures and Roadway safety

  28. Integration Example Structures and Roadway safety

  29. Utility InterfacesExisiting vs. Proposed

  30. Utility Interfaces

  31. Utility Interface Watermain at 20th St. Bridge

  32. Water Main Proximity to Tiebacks for R-40-409 Wall

  33. R-40-409 Retaining Wall Interface Complexity

  34. R-40-409 Retaining Wall

  35. R-40-409 Retaining Wall

  36. R-40-409 Retaining Wall

  37. R-40-409 Retaining Wall

  38. R-40-409 Retaining Wall

  39. R-40-409 Retaining Wall

  40. R-40-409 Retaining Wall

  41. R-40-409 Retaining Wall

  42. R-40-409 Retaining Wall

  43. R-40-409 Retaining Wall

  44. R-40-409 Retaining Wall

  45. R-40-409 Retaining Wall

  46. R-40-409 Retaining Wall

  47. R-40-409 Retaining Wall

  48. 3D/4D design tools Interface Emphasis • Staging – Project/Program • Temporary Roadways • Temporary drainage connections • Preliminary phase construction • Temporary Fills, Drainage, Lighting,…. • Partial Construction • Access in and out of work zone • Staging areas

  49. Quality plans address…. • Look for and resolve Interface Issues • Within Project • Between Projects • Manage Earthwork holistically • Deliver Aggressive Schedule with consideration for weather

  50. Mitchell Interchange – BIM to Reality

More Related