1 / 13

New Website Design

New Website Design. Meetings. Overview. Master Plan. Projects. Contact Us. Franklin County Update. Project Location. Franklin County Update. Federal Highway is the Lead Agency Cooperating Agencies FL Department of Agriculture and Consumer Services FL Department of State

darby
Download Presentation

New Website Design

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New Website Design

  2. Meetings

  3. Overview

  4. Master Plan

  5. Projects

  6. Contact Us

  7. Franklin County Update Project Location

  8. Franklin County Update • Federal Highway is the Lead Agency • Cooperating Agencies • FL Department of Agriculture and Consumer Services • FL Department of State • National Marine Fisheries Services • US Fish and Wildlife Services • Efficient Transportation Decision Making Process (ETDM) • Public Agency Comment Received 10/13/09 • Final Degree of Effect Responses to FDOT 11/09/09 • FHWA Will Assign Class of Action (COA)

  9. Franklin County Update • Purpose and Need issues were identified • Project area has multiple sets of issues • FHWA Recommendation • EIS: US 98 from Carrabelle to US 319 • Possible Lesser Study US from Eastpoint to Carrabelle • EA or Lesser Study: North / South Evacuation Routes • Separate Purpose and Need statements for each section

  10. Franklin County Update

  11. Franklin County Update • Publish Agency Comment on ETDM • Class of Action (01/30/2010) • 1 Environmental Impact Study (EIS) • 5 Environmental Assessments (EA) • Notice of Intent (02/1/2010) • Public Information Meeting (March) • Agency Scoping Meeting (March)

  12. Franklin County Update Additional Project Information www.us98-franklin.com

More Related