POWER GENERATION in the Bahamas

2011 ENERGY CONFERENCE Miami Beach 23 rd – 25 th October, 2011. POWER GENERATION in the Bahamas. It was formed out of the Electrical Department which had its beginnings 104 years ago in 1907. Development was very mild UNTIL CASTRO CAME TO POWER AND CUBA WENT COMMUNIST

darby
Download Presentation

POWER GENERATION in the Bahamas

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2011 ENERGY CONFERENCE Miami Beach 23rd – 25th October, 2011 POWER GENERATIONinthe Bahamas

  2. It was formed out of the Electrical Department which had its beginnings 104 years ago in 1907. Development was very mild UNTIL CASTRO CAME TO POWER AND CUBA WENT COMMUNIST American tourist trade shifted to The Bahamas The Beginning

  3. The 1960’s saw very rapid, economic development first with hotels and local entertainment, taxis, local culture craft then merchants shops with special tax-free items designed to attract more tourists. Items such as watches, perfume and jewelry. • The economy flourished with many persons holding two well paying jobs • The demand for power GREW rapidly ECONOMIC DEVELOPMENT. (new Providence)

  4. Prior to the 1960’s all power generation was by medium speed four stroke diesels burning #2 diesel. • The beginning of the 1960’s saw the commissioning of a steam powered station burning a #6 fuel oil • In 1963 Sulzer commissioned the first ever land based slow speed two stroke diesel generator also burning #6 fuel oil. power development (new providence)

  5. Rapid demand growth quickly out stripped supply and the BEC was unable to meet the demand resulting in one hotel being given the concession to install generation to meet a part of its load requirements. This they did with a total energy plant based on diesel engines with a combined thermal efficiency in the mid-80% compared with straight run diesels of only 30%. Power issues (new providence)

  6. The high demand for power resulted in maintenance staff working 24 hours to meet the demand and the maintenance requirements of the many medium speed four stroke diesel engines. Manpower costs was a major corporate expense. Power issues (new providence)

  7. High maintenance manpower costs, low fuel costs combined with the need to rapidly install additional generation was a classic fit for combustion turbines burning #2 diesel oil. In the late 1960’s the BEC committed to installing four combustion turbines the first of which was installed in 1971. Power solution (new providence

  8. Then in 1973 the Arab oil embargo turned every thing upside down. The major expense was no longer manpower costs, it was energy costs The purchased combustion turbines were operating at efficiencies of only 20%! Fuel costs were driving the corporation deep into debt. New power issue

  9. Graph tells it all.

  10. ? What was the answer?

  11. The Bahamas Electricity Corporation serves communities on 16 separate island groups using 26 separate generation facilities! The islands cover an area roughly the size of Florida so there is no interconnection because of the large distances between them. Bahamas Power demographics

  12. demographics

  13. The Bahamas Electricity Corporation serves 26 island communities on 16 islands spread across an area roughly the size of Florida Yet it is in the top ten with the lowest $/kwh in the Caribbean, a region with 22 members in the regional electric power association (CARILEC) The majority of these member countries are only one or two land masses. Regional relevance

  14. ? How does it do this?

  15. FUEL OIL And LOW SPEED TWO-STROKE DIESEL ENGINES The answers to both questions are:

  16. All electrical generation in The Bahamas is thermal, using either a #6 residual fuel (RMG35) or a #2 gas oil (DMB) There is a total installed electrical generation capacity of 450 Megawatts. 350 Megawatts is located on the island of New Providence which is the commercial centre and where 66% of the total population reside. The remaining 100 Megawatts is spread over 26 power stations located on 15 island groups. GENERATION CAPACITY

  17. All generation of electrical power is produced either by Large slow speed diesel generators Combustion turbines in either simple cycle or combined cycle mode. Medium speed or high speed diesel generators Power Generation Machinery

  18. There are two power stations on the island of New Providence which also provide power for the tourist resort of Paradise Island. Clifton Pier Power Station located at the south-west coast of the island and adjacent to the bulk oil terminal of Exxon, Chevron and SUN OIL (Shell licensee) Blue Hills Power Station located in the centre of the island and connected to Clifton Pier by two six-inch fuel pipelines which supply gas oil. Generation Capacity (New Providence)

  19. Clifton Pier Power Station (175 Mw’s) consists of 9 slow speed diesel engines. 4 of Sulzer design at 10.7 Mw’s each 2 of Burmeister & Wain design at 26.5 Mw’s each 2 of Burmeister & Wain design at 31.5 Mw’s each. 1 of Burmeister & Wain design of 18 Mw’s. Generation Capacity (New Providence)Clifton Pier Power Station

  20. Blue Hills Power Station (160 Mw’s) consists of 4 simple cycle combustion turbines and 1 combined cycle unit consisting of 2 combustion turbines feeding 1 steam unit. 4 Hitachi turbines at 23.5 Mw’s each. 2 General Electric turbines @ 20 and 21Mw’s. 1 Kawasaki steam turbine at 22 Mw’s powered by 2 of the Hitachi turbines. Generation Capacity (New Providence)Blue Hills Power Station

  21. Exuma – 4 Power Stations Great Harbour Cay – 1 Power Station Long Cay – 1 Power Station Long Island – 1 Power Station Mayaguana – 1 Power Station Rum Cay – 1 Power Station San Salvador – 1 Power Station Inagua – 1 Power Station Generation Capacity (Family Islands)

  22. Abaco – 4 Power Stations Acklins – 2 Power Stations Andros – 3 Power Stations Bimini – 1 Power Station Cat Island – 1 Power Station Crooked Island – 1 Power Station Eleuthera – 3 Power Stations Generation Capacity (Family Islands)

  23. Currently, all fuel oil consumption is on the island of New Providence being burnt in the slow speed diesels. There are plans to also burn fuel oil in the new power station that has been built on the island of Abaco. It is anticipated that the use of fuel oil will also be migrated to other islands as machinery is replaced. FUEL OIL CONSUMPTION (New Providence.)

  24. Combustion turbines operate between 18% to 28% thermal efficiencies over their load range. Combustion turbines in combined cycle mode still only produce efficiencies over their load range of between 32% to 40% Low speed two stroke diesels produce efficiencies over their load range of between 48 – 53%. FUEL OIL AND LOW SPEED TWO STROKE DIESELS

  25. The low speed two stroke diesel with its high efficiencies and ability to effectively and reliably burn the low cost residual fuels generates electricity on the order of 15 - 20 cents/kwh (fuel cost) over their entire load range. Combustion turbines which do not have the efficiency of the diesels and which burn the more expensive gas oils produce power in the area of 30 - 40 cents/kwh (fuel cost). Relative costs

  26. Heavy Fuel Oil burn or capable Heavy Fuel Oil retrofit possible Heavy Fuel Oil future consideration

  27. Generation Capacity (Family Islands) • Abaco – 4 Power Stations (1 with HFO capability) • Acklins – 2 Power Stations • Andros – 3 Power Stations • Bimini – 1 Power Station(HFO retro-fit possible) • Cat Island – 1 Power Station (Future HFO considered) • Crooked Island – 1 Power Station • Eleuthera – 3 Power Stations(1 with HFO retro-fit possibility)

  28. FUEL OIL CONSUMPTION (New Providence.)

  29. Gas oil consumption on New Providence is in the combustion turbines as well as a limited quantity for start-up and shut down of the slow speed diesels. GAS OIL CONSUMPTION (New Providence.)

  30. GAS OIL CONSUMPTION (New Providence.)

  31. GAS OIL CONSUMPTION (Family Islands)

  32. FUEL OIL QUALITY ISSUES • The major concerns over heavy fuel quality are:

  33. GAS OIL QUALITY ISSUES • The only issue recently over gas oil quality was :

  34. The Bahamas has no oil of its own and all fuel is imported. Traditionally, the bulk fuel supplier has been one of the local three major oil companies, Shell, Esso or Texaco/Chevron. These local entities would establish joint ventures with their larger trading partners to meet the supply demand. FUEL SOURCES

  35. BULK STORAGE TANK FARM H.F.O. Tk .13 = 95 Kb Tk. 14 = 95 Kb Tk. 15 = 95 Kb TOTAL =285 Kb No. 2 diesel TK. 10 = 80 Kb Tk. 11 = 110 Kb TOTAL = 190 Kb

  36. This Sea Berth is designed to accommodate Tankers of up to 45,000 DWT, with a maximum length of 630 ft., 225 ft. vessel parallel mid-body in normal ballast, a freeboard of 9.0-ft. and a maximum draft of 35 ft. 9 inches The term tug means a vessel designed for assisting vessels with docking and undocking in restricted waters and an available horsepower of 2500 hp or greater. These tug requirements are considered the minimum acceptable by the berth operator. BERTH REQUIREMENTS

  37. Clifton Pier Deep Water Berthing Facility

  38. Being an archipelago spread over an area roughly the size of Florida, all fuel supply is waterbourne. Bulk supply for both New Providence and Family Island consumption is by ocean going tanker to the deep water port at Clifton Pier where the Clifton Pier Power Station is located. Gas oil is delivered to the Blue Hills Power Station on New Providence via two 6” underground pipelines LOGISTICSNew Providence

  39. Gas oil is delivered to 26 power stations on 15 islands by intercoastal tanker. This is the responsibility of the bulk fuel supplier who enters into an agreement with a third party that charters purpose built vessels. The schedule of deliveries is managed by BEC providing weekly updates of the inventories and burn rates at each location. LOGISTICSFamily Islands

  40. The intercoastal tankers take on fuel at the Clifton Pier loading facility. Each of three ships has a capacity of between 160,000 to 210,000 gallons. (3,800 – 5,000 barrels) Some locations however cannot accommodate the vessel fully laden. The vessel would then first off-load some of its product at a port with deeper draft before proceeding on to the shallower draft facilities. LOGISTICS (Family Islands)Difficulties

  41. Inter-Coastal tankerFamily Island Deliveries.

  42. Further difficulties exist since there is a wide variation in consumption patterns for many of the locations depending on the time of year and whether any local festivals are occurring. These generally take the form of regattas, deep sea fishing tournaments, homecomings, or crab festivals. LOGISTICS (Family Islands)Difficulties

  43. Weather plays an important part in the delivery to Family Islands. During hurricane season a couple of years ago, deliveries were delayed at several locations up to 11 days due in part to Hurricanes Gustav, Hanna, and Ike There are also the concerns of safety which prohibit pumping outside daylight hours. Communication issues between each location and the ship. Inventory coordination at each location LOGISTICS (Family Islands)Difficulties

  44. Heavy Fuel Oil is delivered in quantities of 130,000 to 160,000 barrels. Gas Oil is delivered in quantities of 90,000 to 120,000 barrels. BULK DELIVERIES

  45. BEC is currently considering the design and construction of two additional large slow speed diesels at Clifton Pier. These machines, anticipated to be rated at 40 Megawatts each will displace much of the current gas oil consumption with heavy fuel oil and cater more efficiently to the demand for power. ANTICIPATED CHANGES

  46. The new power station on the island of Abaco was designed and built to burn HFO. Several slides follow showing its construction. Financial constraints will require other Family Island stations to operate on HFO as machinery is upgraded. ANTICIPATED CHANGESFamily Islands

  47. The following 7 slides show various stages of the construction of the power station at Wilson City on the island of Abaco.

More Related