Headlamps Assembly Loop for Ford Aero Headlights. Valverde-Ventura Rene Vouravis Veerakachen. Current Situation. 7.2 hours of production shifts The current production of 2892 pieces per shifts can’t meet the required production of 3002 pieces per shifts

darena
Download Presentation

Headlamps Assembly Loop for Ford Aero Headlights

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Headlamps Assembly Loop for Ford Aero Headlights Valverde-Ventura Rene Vouravis Veerakachen

  2. Current Situation • 7.2 hours of production shifts • The current production of 2892 pieces per shifts can’t meet the required production of 3002 pieces per shifts • Need changes in designs to improve the performance of the loop

  3. Current Layout

  4. Requirement • 3002 pieces of good parts during 7.2 hour shifts. • Minimum cost

  5. Design Changes • Number of pallets • Operating procedure for Leak Test Stations • Additional Aimer

  6. Number of Pallets • Find the Optimum number of Pallets • Minimum number of pallet is 44 • The Optimum number of pallet is 52 • Delivers the production of 2902 parts per shift

  7. Change Operating Procedure of Leak Test Station • Originally, 3 machines in the station operate simultaneously • We modified the operating procedure that each machine in the stations works independently

  8. Additional Aimer • Reduce the Blocking rate of previous station • Improve the loop performance

  9. Recommendation • Changing operating procedure of the Leak Test Stations should be done first • Next, change the number of pallets to the optimum • Add the Aimer, depending on the management’s cost justification

  10. Modified Layout