An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011) S1-Global Test

  2. Construction and Test Schedule of S1-Global Cryomodule S1-Global Test

  3. June, 2010 Mon Tue Wed Thu Fri Sat Sun Cool-down Start Heat Load Meas. at 4K to 2K 1. Low Power RF Test (Tuner stroke, fo, QL) 2. Low Power RF Test (Cal. Qt, HOM filter, Hysteresis) S1-Global Test

  4. July, 2010 Mon Tue Wed Thu Fri Sat Sun 3. Low Power RF Test Carlo, Rocco, Angello (INFN), Yuriy (FNAL) Tuner tests by INFN/FNAL/KEK Heat Load Meas. at 2K Calib. Meas. at 2K by Heater Holiday 4. Low Power RF Test Warm up (Mechanical vibration, HOM Qext) S1-Global Test

  5. August, 2010 Mon Tue Wed Thu Fri Sat Sun Kasokuki @ Himeji (maintenance) Coupler Aging Preparation Coupler Aging A-1, C-1 S1-Global Test

  6. September, 2010 Mon Tue Wed Thu Fri Sat Sun Coupler Processing A-1,2,3,4 C-1,2,3,4 Coupler Processing A-1,2,3,4 C-1,2,3,4 Cool-down Start C-4/A-4 Heat Load Meas. at 4K to 2K (Holiday) Holiday High Gradient Exp. D. Kostin (DESY) fo & QL A-2/C-2 A-2 High Gradient Exp. D. Kostin (DESY) C-2 C-2/C-3 C-3 C-4 S1-Global Test

  7. October, 2010 Mon Tue Wed Thu Fri Sat Sun H.G. Lorentz Detuning Comp. C-1 C-1 C-2 C-3 C-4 Y. Pichalnikov W. Schappert (FNAL) Lorentz Detuning Comp. Holiday C-1 /(A-3) A-3 C-3,4 A-2 High Gradient Exp. L.D.C. GDE @ CERN A-4 A-1 C-1,2,3,4 (Dynamic Loss Meas.) A. Hocker (FNAL) Trouble of cryogenic system S1-Global Test

  8. November, 2010 Mon Tue Wed Thu Fri Sat Sun (Holiday) Repair of cryogenic system Lorentz Detuning Compensation A-2/C-4 A-3/C-1 A-1/C-3 (A-4/C-2) Dynamic Loss Meas. C-4 C-1 (Holiday) Dynamic Loss Meas. Cx4 detune A-3 A-2 A-2 S1-Global Test

  9. December, 2010 Mon Tue Wed Thu Fri Sat Sun A x 4 coupler process Dynamic Loss 4 Cav. Control A x 4 detune C x 4 A x 4 Dynamic Loss 7 Cavity Control 7 cav. 7 cav. LLRF (7 Cavity Control) Holiday Heat Load at 2K Calibration by Heater DRFS Preparation Warm up S1-Global Test

  10. January, 2011 Sun Mon Tue Wed Thu Fri Sat Holiday Cool-down Start S1-Global Test

  11. February, 2011 Mon Tue Wed Thu Fri Sat Sun Cavity Performance Check fo, QL, Eacc,max, piezo Holiday DRFS (1) DRFS (2) DRFS (3) Warm up TTC @ Milano S1-Global Test