110 likes | 224 Views
PUCC Project. I. E. Ndustrial ngineering 200126162 Ahn T Young 200327183 Jung J Yeop 200327199 Hwang Min. J. Survey. I. Alternative. II. Cost. III. Contents. Problems. IV. I. Survey(1).
E N D
PUCC Project I E Ndustrial ngineering 200126162 Ahn T Young 200327183 Jung J Yeop 200327199 Hwang Min J
Survey I Alternative II Cost III Contents Problems IV
I. Survey(1) • Object : Students of P.N.U • Period : 2007. Sep. ~2007. Nov. • Determining of No. : 384 = • Confidence Lever : 95% • Standard Error : +-5% • Questions • Q1. Have you ever heard P.N.U Underground Campus • Center(PUCC) Project? • Yes(3(0.78%)) No(381(99.22%))
I. Survey(2) • Q2. Do You Agree PUCC Project ? • Yes(302(79%)) No(67(17%)) The Others(15(4%)) • Q3. Why do you agree ? • Convenience of Move (212(51%)) • Improved Utility of Spaces (89(23%)) • Improved Reputation of School (58(15%)) • The Others (25(7%))
I. Survey(3) • Q4. What is your frequent visiting place in P.N.U ? • Own Department Building(117(31%)) • Middle Library(93(24%)) • The Main Gate of School(76(20%)) • The Buk Gate of School(51(13%)) • The Electronic Calculating Building(30(8%)) • The Others(17(4%))
I. Survey 734m 485m 250m
Considerations I.E- tical Method Best Solution Another Alternative Additional Cost Construct Period I. Mission & Direction