An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Scheduling EE249

  2. What’s the problem? • Have some work to do • know subtasks • Have limited resources • Have some constraints to meet • Want to optimize quality EE249

  3. Outline • Overview • shop scheduling • data-flow scheduling • real-time scheduling • OS scheduling • Real-time scheduling • RTOS generation • scheduling • Communication • Data-flow scheduling • pure • Petri nets EE249

  4. Shop scheduling Single job, one time • finite and known amount of work • multiple resources of different kind • often minimize lateness • could add release, precedence, deadlines, ... SOLUTION: compute the schedule APPLICATION: manufacturing EE249

  5. Data-flow scheduling Single-job, repeatedly • known amount of work • simple subtasks • multi-processor • max. throughput, min. latency SOLUTION: code generation APPLICATION: signal processing EE249

  6. Data-flow scheduling variants • Work • data dependent (BDF, FCPN) • Resources • many different execution units (HLS) • Goal • min. code, min. buffers, min. resources EE249

  7. Real-time scheduling Fixed number of repeating jobs • each job has fixed work • job is a sub-task • processor(s) • meet individual deadlines SOLUTION: choose policy, let RTOS implement it APPLICATION: real-time control EE249

  8. RT scheduling variants • Work • sporadic or event-driven tasks, • variable (data dependent) work • coordination between tasks: • mutual exclusion, precedence, … • Goal • event loss, input or output correlation, freshness, soft deadlines, ... EE249

  9. OS scheduling Variable number of random tasks • know nothing about sub-tasks • processor + other computer resources • progress of all tasks, average service time SOLUTION: OS implements time-slicing APPLICATION: computer systems EE249

  10. Outline • Overview • shop scheduling • data-flow scheduling • real-time scheduling • OS scheduling • Real-time scheduling • RTOS generation • Scheduling • Communication • Data-flow scheduling • pure • Petri nets EE249

  11. RTOS functions • Enable communication between software tasks, hardware and other system resources • Coordinate software tasks • keep track which tasks are ready to execute • decide which one to execute: scheduling EE249

  12. Outline • Implementing communication through events • Coordination: • classic scheduling results • reactive model of real-time systems • conservative scheduling analysis • priority assignment EE249

  13. The scheduling problem • Given: • estimates on execution times of each task • timing constraints • Find: • an execution ordering of tasks that satisfies constraints • A schedule needs to be: • constructed • validated EE249

  14. Off-line vs. on-line scheduling • Plus side: • simpler • lower overhead • highly predictable • Minus side • bad service to urgent tasks • independent of actual requests EE249

  15. Scheduling Algorithms • off-line (pre-run-time, static) • round-robin, e.g. • C1 C2 C3 C4 C1 C2 C3 C4 C1 C2 C3 C4 … • static cyclic, e. g. • C1 C2 C3 C2 C4 C1 C2 C3 C2 C4 C1 C2 … • on-line (run-time, dynamic) • static priority • dynamic priority • preemptive or not EE249

  16. Static priority scheduling • synthesis: • priority assignment • RMS [LL73] • analysis • Audsley 91 EE249

  17. Rate Monotonic Scheduling • Liu -Layland [73]consider systems consisting of tasks: • enabled periodically • with fixed run time • that should be executed before enabled again • scheduled preemptively with statically assigned priorities EE249

  18. Rate Monotonic Scheduling • giving higher priority to tasks with shorter period (RMS) is optimal • if any other static priority assignment can schedule it, them RMS can do it too • define utilization as sum of Ei/Ti • any set of n tasks with utilization of less than n(21/n-1) is schedulable • for n=2,3,…. n(21/n-1) = 0.83, 0.78, … ln(2)=0.69 EE249

  19. Static Priority Schedule Validation Audsley [91]: • for a task in Liu-Layland’s model find its worst case execution time k n i i i i i time WCET i run time i period i period i EE249

  20. Audsley’s algorithm • let Ei’s be run-times, Ti’s periods • how much can i be delayed by a higher priority task k: • each execution delays it by Ek • while i is executing k will be executed ciel(WCETi/ Tk) • WCETi = Ei + SUMk>i ciel(WCETi/ Tk)* Ek EE249

  21. Solving implicit equation • iteration • WCETi,0 = Ei • WCETi,n+1 = Ei + SUMk>i ciel(WCETi,n/ Tk)* Ek will converge if processor utilization if less than 1 EE249

  22. Dynamic priority • Earliest deadline first: • at each moment schedule a task with the least time before next occurrence • LL have shown that for their model, EDF schedules any feasible set of tasks EE249

  23. What’s wrong with LL model? • Liu-Layland model yields strong results but does not model reactivity well • Our model: • models reactivity directly • abstracts functionality • allows efficient conservative schedule validation EE249

  24. Computation Model • System is a network of internal and external tasks • External tasks have minimum times between execution • Internal tasks have priorities and run times 20 1,2 5,2 3,2 10 2,1 4,1 EE249

  25. Computation Model 20 1,2 5,2 3,2 10 2,1 4,1 • External task execute at random, respecting the lower bound between executions • Execution of a task enables all its successors • Correct if no events are lost EE249

  26. Schedule Validation • To check correctness: • check whether internal events can be lost • priority analysis • check whether external events can be lost • bound WCET EE249

  27. More general: if fan-ins of i form a tree such that leaves have lower priority than non-leaves and k, then (i,k) cannot be lost i k Validation for Internal Events • Simple: if priority of i is less than k, then (i,k) cannot be lost i k EE249

  28. Validation for External Events • Compute a bound on the period of time a processor executes task of priority i or higher (i-busy period) > i > i > i i i < i < i time i-busy period • (i-busy period ) > ( WCETi ) EE249

  29. Bounding i-busy Period • i-busy period is bounded by: • initial workload at priority level i or higher caused by execution of some task < i • workload at priority level i or higher caused by execution of external tasks during the i-busy period • can find (by simulation) workload at priority level i or higher caused by execution of a single task • can bound the number of occurrences of external tasks in a given period • need to solve a fix-point equation EE249

  30. System: Network of CFSMs F B=>C C=>F G C=>G F^(G==1) C C=>A CFSM1 CFSM2 C C=>B A B C=>B (A==0)=>B CFSM3 EE249

  31. Implementations • CFSMs can be implemented: • in hardware: HW-CFSMs • in software: SW-CFSMs • by built-in peripherals (e.g. timer): MP-CFSMs EE249

  32. Events: SW to SW • for every event, RTOS maintains • global values • local flags x CFSM2 x emit x( 3 ) detect x CFSM1 CFSM3 x 3 EE249

  33. Events: atomicity problems • TASK 1 detects y AND NOT x, which is never true • to avoid, need atomic detects TASK 1 detect x detect y TASK 2 emit x TASK 3 if detect x then emit y EE249

  34. Events: SW to SW • for atomicity: • always read from frozen • others always write to live • at the beginning of execution, switch CFSM live frozen EE249

  35. Events: HW to SW • event can be polled or driving an interrupt • for polled events: • allocate I/O port bits for value, occurrence and acknowledge flags • generate the polling task that acknowledges and emits all polled events that have occurred • for events driving an interrupt: • allocate I/O port bits for value, • allocate an interrupt vector, • create an interrupt service routine that emits an event EE249

  36. Events: interrupts • interrupt service routine: • optional interrupt service routine: { emit x } { emit x execute SW-CFSM } R T O S X IRQ X HW-CFSM SW-CFSM EE249

  37. Events: SW to HW • allocate I/O port bits for value and occurrence flag • use existing ports or memory-mapped ports • write value to I/O port • create a pulse on occurrence flag EE249

  38. Events: SW to/from MP • every peripheral must have a library with • init function (to be called at initialization time) • deliver function for each input (to be called by emit) • detect function for each output (to be called by poll-taker) • interrupt service routine (containing emit) EE249

  39. Coordination • consider SW-CFSM ready to run whenever it has some not consumed input events • choose the next ready SW-CFSM to run: • scheduling problem EE249

  40. Experiments • dashboard • 6 tasks, 13 events • 0.1s (8.6s to estimate run times) • shock absorber controller • 48 tasks, 11 events • 0.3s (880s to estimate run times) • PATHO RTOS • orders of magnitude faster than timed automata • scales linearly EE249

  41. Open Problems • Propagation of constraints from external I/O behavior to each CFSM • probabilistic: Markov chains • exact: FSM state traversal • Satisfaction of constraints within a single transition (e.g., software-driven bus interface protocol) • Automatic choice of scheduling algorithm, based on performance estimation and constraints • Scheduling for verifiability EE249

  42. Outline • Overview • shop scheduling • data-flow scheduling • real-time scheduling • OS scheduling • Real-time scheduling • RTOS generation • scheduling • Communication • Data-flow scheduling • pure • Petri nets EE249

  43. Data-flow scheduling • Functionality usually represented with a data-flow graph • Kahn’s conditions allow scheduling freedom • if a computation is specified with actors (operators) and data dependency, and • every actor waits for data on all inputs before firing, and • no data is lost • then the firing order doesn’t matter EE249

  44. Data-flow graphs • Schedule: a firing order that respects data-flow constraints and returns the graph to initial state A, 1 B, 2 D, 1 C, 3 EE249

  45. Schedule implementation Static scheduling (cyclic executive, round robin) • A, B, C, D are processes • RTOS schedules them repeatedly in order A D B C • simple, but context-switching overhead large A, 1 B, 2 A schedule: A D B C D, 1 C, 3 EE249

  46. Schedule implementation Code synthesis (OS generation) • A, B, C, D are subroutines • generate: forever{ call A; call D; call B; call C; } • less robust, better overhead A, 1 B, 2 A schedule: A D B C D, 1 C, 3 EE249

  47. Schedule implementation In-lined code synthesis • A, B, C, D are code fragments • generate: forever{A; D; B; C; } • even less robust, even better overhead A, 1 B, 2 A schedule: A D B C D, 1 C, 3 EE249

  48. Data-flow scheduling Resources • fixed or arbitrary number of processors Goal: • max. throughput given a fixed number of processors • min. processors to achieve required throughput EE249

  49. Data-flow scheduling goals Max. throughput given a fixed number of processors • it is NP-hard to determine max. achievable throughput Min. processors to achieve required throughput • if there are loops than there is a fundamental upper bound • easy to compute EE249

  50. Throughput bound 1/maxloops(Time/Delay) A, 1 B, 2 D, 1 C, 3 N+2’nd output of A can be computed at least 7 time units after the Nth EE249