T-506 REPORT FOR 6-25-13

T-506 REPORT FOR 6-25-13. Install sample PF14 and cool down Accumulated 20 MR over shift. T-506 PLAN FOR 6-26-13. Dedicated run with dosimeter to correct dose rate estimates from EGS Complete 3 rd of four 20 MRad exposures. First Results

dawn-bryan
Download Presentation

T-506 REPORT FOR 6-25-13

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. T-506 REPORT FOR 6-25-13 • Install sample PF14 and cool down • Accumulated 20 MR over shift T-506 PLAN FOR 6-26-13 • Dedicated run with dosimeter to correct dose rate estimates from EGS • Complete 3rd of four 20 MRad exposures

  2. First Results 5 MR irradiation of “Standard” (float-zone) p-type sensor No increase in depletion voltage ~7% loss of signal might be inconsistent calibration (warm v. cold). 20 MR exposure done yesterday! Before Irradiation After 5 MRad