1 / 8

Arranging studies on mobility management in ITU-T

Arranging studies on mobility management in ITU-T. 16 th CJK NGN-WG. July 2009 TTC (Hideo Imanaka: NTT) Imanaka.hideo<at>lab.ntt.co.jp. Study issues on MM in SG13. Results of joint meeting of Q1, 3, 4, 5, 8, 11, 14/13 at NGN-GSI in May 2009 to arrange mobility management studies in ITU-T

daxia
Download Presentation

Arranging studies on mobility management in ITU-T

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Arranging studies on mobility management in ITU-T 16th CJK NGN-WG • July 2009 • TTC • (Hideo Imanaka: NTT) • Imanaka.hideo<at>lab.ntt.co.jp

  2. Study issues on MM in SG13 • Results of joint meeting of Q1, 3, 4, 5, 8, 11, 14/13 at NGN-GSI in May 2009 to arrange mobility management studies in ITU-T • In NGN Release 2 requirements, mobility capabilities for voice services with the same terminal and the same QoS level to be mandate requirement, and the other mobility requirements to be optional • To clarify scope of mobility architecture Recommendations, Y.MMCF, Y.FMC-IMS and Y.SMF, by using table of TD2 (NGN-GSI) for rappouteurs of Q5, 8, 11/13 • To map mobility-related draft Recommendations into mobility management roadmap (MM-roadmap), TD165 (NGN-GSI) developed by Q1/13 for all MM-related rapporteures • To arrange MM-related studies including 3GPP work by using MM-roadmap • To further arrange MM-related studies at joint meeting in September • Issues to be discussed at next SG13 meeting • Mapping of MM-roadmap • Way to arrange MM-related studies by using MM-roadmap

  3. Objectives of this contribution • To discuss following items for further arrangement of mobility-related studies in SG13 in September • Arrangement of scopes of mobility architecture Recommendations based on TD2 • Confirmation of mapping MM-related draft Recommendations onto MM-roadmap • Items studies by other SDOs, and confirmation of utilizing study results from other SDOs to avoid duplicating work • Methods of arrangement and information exchange, such as use of liaisons • To reflect result of this discussion in contributions to MM-roadmap for next SG13 meeting in September • To hear from CK about other issues to be solved arrangement of MM-related studies

  4. Proposal of revised MM-roadmap • Proposed MM-roadmap including 3GPP studies

  5. Revised MM-roadmap (cont.)

  6. Revised MM-roadmap (cont.)

  7. Proposals • For Q8, 11/13 rappouteurs, to clarify the scope of mobility architecture Recommendations Y.FMC-IMS and Y.SMF by using table of TD2 • For Q3, 4, 8, 11, 14/13 rappouteurs, to map MM-related draft Recommendations onto MM-roadmap • To confirm results, to avoid duplicating work, with other SDOs, and to hear how to exchange information with other SDOs such as 3GPP • To have a joint meeting on MM-related coordination at next SG13 meeting in September

  8. Proposed milestones August July To inform result of confirmation about MM-roadmap from MM-related Questions to Q1/13 rapporteur E-mail exchange about TD2 MM roadmap TD2 table Contribution Deadline CJK NGN-WG SG13@Mar del Plata Kaleidoscope Send revised MM-roadmap - until 12th Milestones CJK adhoc?

More Related