An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Old ROD + new BOCdesign plans T. Flick University Wuppertal ATLAS Tracker Upgrade Week 23.-27.02.2009 CERN

  2. Overview • Reminder of present design • Recommendations of System Design TF • Consequences of using the “old” ROD • BOC card requirements and design plan • Open (not covered) issues old ROD + new BOC

  3. Present Layout Add/adopt components for higher speed on-detector Exchange BOC Keep ROD and TIM TTC: From off-detector to on-detector, BPM encoded clock (40 MHz) and data (40 Mb/s) signal Data: From on-detector to off-detector, 40 Mb/s or 80 Mb/s NRZ signal. old ROD + new BOC

  4. Recommendations • System Design (for sLHC) Taskforce set up a recommendation document for the IBL readout system: Summary of IBL I/O Recommendations • TTC • Optical Downlink BPM encoded: • 40 MHz clock and 40 Mb/s commands • Electrical links DORIC to FE-I4 • 2x LVDS: 40 MHz clock & 40 Mb/s commands • Each link drives two FE-I4 chips • Data Output • Electrical link FE-I4 to VDC • 1x LVDS / FE-I4 at 160 Mbps • Encoded as 8bit/10bit • Optical Uplink: 1 optical link/FE-I4 at 160 Mb/s old ROD + new BOC

  5. Recommendations • BOC/ROD • TTC: • 40 MHz clock & 40 Mb/s data • BPM encoded as present system • Data: • Input 160 Mb/s input links • 8bit/10bit decoded in BOC • Data passed to ROD as 4 x 40 Mb/s streams • 8 input links per BOC/ROD old ROD + new BOC

  6. Use the “old” ROD • Present ROD can be used • It needs 40 Mb/s input streams • Can drive out 160 MB/s data due to S-Link capability • New firmware can be used, but would not really be needed though Readout Driver (ROD) old ROD + new BOC

  7. Consequences • 40 MHz clock sent to detector • Need of clock multiplier on-detector to achieve the 160 Mb/s upstream (need at least 80 MHz clock on FE-chip) • Encoding on both, down- and up-link • BOC must decode the data • 8 input links at 160 Mb/s can be handled • Need to produce many cards with few channels • Install 4 new crates for readout hardware old ROD + new BOC

  8. New BOC Requirements • Transmitting section unchanged (only in channels) • S-Link section unchanged • Clock section needs to be adopted to higher clocks (160 MHz clock) • Receiving section • must handle 160 Mb/s input stream • must split 160 Mb/s into 4x 40 Mb/s streams • Decoding of 8/10b data (and clock?) • Phase and sampling threshold adoption • Synchronize data to ROD clock Present BOC card Rx Plugin Tx Plugin old ROD + new BOC

  9. Open Issues • 1 TTC link per 2 FE chip (while 1 Data link per single FE): • Implication on modularity • 8 data links per BOC/ROD are fixed maximum • 4 TTC links per BOC/ROD? • Fibre ribbon splitting?? • Channel wise control of VCSEL and PiN diodes • Optical components, coming from where? • Connector layout • Communication protocol • No time for new ASICs! • On-detector clock multiplier old ROD + new BOC

  10. Design Plans • Wuppertal and Heidelberg groups plan to work together on this *) • Lay down requirements in first half of 2009, then: • Card design work will be done in Heidelberg • Test system development in Wuppertal • Test work can be shared • Planed is prototyping of 2 versions until 2011 and the production until 2012. *) Funding decision pending, expected soon old ROD + new BOC

  11. Schedule • Aim is to be ready early 2012, latest mid 2012. • It will be difficult to get series BOCs for system-test usage before. • Prototypes for system-tests should be available. old ROD + new BOC

  12. Conclusion • Old ROD can be used with a newly designed BOC card for reading out the IBL at 160 Mb/s per FE-chip. • Need 64 new BOC cards /RODs for IBL (presently we have 132 pairs) • Need 4 new crates in 2 racks to house the card pairs • BOC design and production by Wuppertal / Heidelberg until early 2012 is foreseen, including 1 or 2 prototypes. • Time is short, we need to be very efficient! old ROD + new BOC