STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION. Dr. DJORDJE ATANACKOVIC, P.Eng . Engineering Team Leader, Power system Applications, Grid Operations Support. STATE ESTIMATOR GENERAL PERFORMANCE REQUIREMENTS. CONVERGENCE SUCCESS RATE OF 98%
E N D
STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION Dr. DJORDJE ATANACKOVIC, P.Eng. Engineering Team Leader, Power system Applications, Grid Operations Support
STATE ESTIMATOR GENERAL PERFORMANCE REQUIREMENTS • CONVERGENCE SUCCESS RATE OF 98% • COST FUNCTION IN THE RANGE OF 8000 – 11000 (~2500 BUSES, 4000 ANALOG MEASUREMENTS) • TOTAL GENERATION ERROR < 40 MW • TOTAL INTERCHANGE ERROR < 10MW • MAX. MW BUS MISMATCH < 50MW • TOTAL LOAD ALLOCATION ERROR < 400MW
STATE ESTIMATOR QUALITY MONITORING – NEW INDICES • TOTAL LOAD ALLOCATION ERROR • TOTAL MW, MVAR LINE FLOW RESIDUAL PER MEASUREMENT • TOTAL MW, MVAR INJECTION RESIDUAL PER MEASUREMENT • TOTAL VOLTAGE AND CURRENT RESIDUAL PER MEASUREMENT
STATE ESTIMATOR QUALITY MONITORING TOTAL LOAD ALLOCATION ERROR • CALCULATED AS A SUM OF LOAD RESIDUALS FOR ALL LOADS IN BC HYDRO AREA • LOAD RESIDUAL IS A DIFFERENCE BETWEEN ESTIMATED LOAD AND ALLOCATED LOAD • BC HYDRO PERFORMANCE CRITERIA : • TOTAL LOAD ALLOCATION ERROR SHOULD NOT EXCEED 600 MW MAXIMUM • AVERAGE LOAD ALLOCATION ERROR OVER A PERIOD OF ONE YEAR SHOULD NOT EXCEED 400 MW
STATE ESTIMATOR QUALITY MONITORING TOTAL MW,MVAR LINE FLOW RESIDUAL PER MEASUREMENT • CALCULATED AS A SUM OF MW/MVAR LINE FLOW RESIDUALS FOR ALL MEASUREMENTS IN THE CONSIDERED ZONE DIVIDED BY NUMBER OF MEASUREMENTS • THREE ZONES ARE USED FOR THIS TRACKING: • TRANSMISSION (230 KV AND ABOVE) • SUBTRANSMISSION (60 – 138KV) • DISTRIBUTION (BELOW 60 KV) • BCTC PERFORMANCE CRITERIA FOR A PERIOD OF ONE YEAR: • TRANSMISSION - BELOW 7 MW • SUBTRANSMISSION - BELOW 15 MW • DISTRIBUTION - BELOW 20 MW
STATE ESTIMATOR QUALITY MONITORING TOTAL MW,MVAR INJECTION RESIDUAL PER MEASUREMENT • CALCULATED AS A SUM OF ALL INJECTION RESIDUALS IN A CONSIDERED ZONE DIVIDED BY NUMBER OF MEASUREMENTS IN THE ZONE • BCH PERFORMANCE CRITERIA FOR A PERIOD OF ONE YEAR: • TRANSMISSION – BELOW 3 MW • SUBTRANSMISSION - BELOW 7 MW • DISTRIBUTION - BELOW 10 MW
STATE ESTIMATOR QUALITY MONITORINGNORMALIZED RESIDUALS • ENABLES RANKING OF MEASUREMENTS OF DIFFERENT TYPES (MW, MVAR, AMPS, KV) BASED ON A NORMALIZED INDEX • BCH PERFORMANCE CRITERION: • NORMALIZED RESIDUAL GREATER THAN 10 UNITS INDICATES A MEASUREMENT OF A LOWER QUALITY • NEEDS IMPROVEMENT : DOES NOT REFLECT ERRORS OF GENERATOR UNIT MEASUREMENT AND OTHER INJECTION MEASUREMENTS
STATE ESTIMATOR QUALITY MONITORINGCONSISTENCY OF VOLTAGE STABILITY REGION
STATE ESTIMATOR PERFORMANCE TRACKING • TRACK SOLUTION QUALITY INDICES IN PI • IMPROVE ONLINE SEQUENCE DISPLAY TO INCLUDE ALERT SIGNALS (FLASHING APPLICATION STATUS BOXES) • MONITOR IMPACT ON OTHER APPLICATIONS E.G. VSA • PERFORM REGULAR REAL TIME TELEMETRY QUALITY ANALYSIS AND PRODUCE TELEMETRY QUALITY REPORTS • ISSUE TELEMETRY CALIBRATION REQUESTS • RTNET SOLUTION INVALIDATED IF QUALITY MEASURES OUTSIDE PERFORMANCE LIMITS