Idaho’s UST Program

Idaho’s UST Program. 8-1-13. UST Program Summary. Fairly New Program Energy Act of 2005 Statute Feb. 2007 Rules April 2008 State Program Approval Feb. 2012. State Program Approval. Effective February 28 th , 2012 What does this mean? Idaho operates the UST program in lieu of EPA

dcuevas
Download Presentation

Idaho’s UST Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Idaho’s UST Program 8-1-13

  2. UST Program Summary • Fairly New Program • Energy Act of 2005 • Statute Feb. 2007 • Rules April 2008 • State Program Approval Feb. 2012

  3. State Program Approval • Effective February 28th, 2012 • What does this mean? • Idaho operates the UST program in lieu of EPA • If EPA conducts inspections they must use Idaho’s rules • Idaho has the lead in conducting enforcement

  4. Idaho’s Tank Universe is Growing… • 2013 is the busiest the tank program has ever been. • When comparing new installs vs. closures: • FY 2010 – 90% decrease • FY 2011 – 51% decrease • FY 2012 – 18% growth • FY 2013 – 73% growth

  5. ..but Idaho’s UST Budget is Shrinking • The Program is funded through EPA. A year ago EPA cut the UST budget $100,000. The cut continues again this year with more cuts anticipated. • What does this mean? • Idaho will not meet its 3 year statutory inspection cycle • EPA (or its contractors) will have to perform inspections • Idaho risks losing what we all worked so hard to achieve over the last 5 years, State Program Approval.

  6. Fiscal Year 2013 in Review • Operator Training • Online: https://www.accessidaho.org/deq/tankhelper/ • Inspections • Currently meeting 3 year inspection cycle but will most likely fall behind Spring 2014 • Enforcement • Informal Warnings – 100 facilities • Formal Warnings – 87 facilities • Field Notices of Violations - 9 facilities

  7. Most Common Violations • Release detection records • No piping release detection • Functional spill bucket • Corrosion testing • Flex connectors touching soil • Training Class C operators • Installing overfill • Insurance • Operator training list • Trained A or B operator

  8. EPA Proposed Regulations • Nov/Dec 2013 • Some of the proposed changes include: • Monthly walkthrough inspections • Annually test spill buckets or use double-walled ones • Annually test release detection equipment (ATGs, sensors) • Every 3 years test overfill • Every 3 years test secondary containment

  9. EPA ProposedRegulations • Emergency generators must do release detection • Oil-water separators must follow regulations • No more ballfloats • Tanks must be closed if internal lining fails • SIR cannot go past 30 days to receive a result • Any ethanol greater than 10% must prove compatibility

  10. EPA Final Regulations • Once EPA finalizes its regulations: • I will travel throughout the State to explain the regulations and answer any questions. • Idaho has 3 years to adopt the regulations or create no-less stringent rules and re-apply for State Program Approval.

  11. For More Information • DEQ’s UST Website: http://www.deq.idaho.gov/waste-mgmt-remediation/storage-tanks.aspx • View all of Idaho’s UST sites at: http://www.deq.idaho.gov/waste/ustlust/ Call or email me: Kristi Lowder 208-373-0347 kristi.lowder@deq.idaho.gov