100 likes | 127 Views
Connecting Programer:. FEM-IB connector is upper back side of board Labels on connector should face towards front of VME Crate:. Connecting Programer:. FEM connector is top side of board Labels on connector should face towards bottom of VME Crate:. Initialzing Programmer.
E N D
Connecting Programer: • FEM-IB connector is upper back side of board • Labels on connector should face towards front of VME Crate:
Connecting Programer: • FEM connector is top side of board • Labels on connector should face towards bottom of VME Crate:
Initialzing Programmer • Under “All Programs” open Xilinx ISE Design Suite 13.1 -> Lab Tools -> Impact • Answer “No” to Automatically Create and Save Box:
Initialzing Programmer • In drop down box: • For FEM-IB board select FEM_IB.ipf • For FEM board select FEM.ipf • Enter OK
You should see 2 devices for FEM-IB and 4 for FEM board FEM-IB FEM
Checks • Click on device • Right click and select “Get Device ID” • Should get “ReadIdcode Succeded” • If failure, then cable is backwards. Correct and repeat. • Close window, answer “NO” to “Save Project”
To Program • Locate Main project file for FPGA to be programed and double click it • For the FEM-IB
To Program • Answer “Yes” when windows gives the warning message. • The Xilinx package should open (Slide 9) • Scroll down to find the Configure Device (iMPACT) option and double click • A new iMPACT window should appear (Slide 10) • Select device to be programed (xcf02s) for the FEM-IB, left click to highlight and right click to get menu. • Select program. Take default options and click on OK button • Wait for operation to complete 30-60 seconds depending on device