Projects in Regional Planning Group Review Process

Projects in Regional Planning Group Review Process. Jay Teixeira, P.E. Lead Engineer, System Planning. Projects Overview. Bell County – TNP One Able Springs HACM Phase II Jewett – West Fairfield Evant – Lampasas Paleface – Miller Parkdale Dynamic Reactive Wilson – Sutherland Springs

deacon
Download Presentation

Projects in Regional Planning Group Review Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Projects in Regional Planning Group Review Process Jay Teixeira, P.E. Lead Engineer, System Planning RPG Meeting

  2. Projects Overview • Bell County – TNP One • Able Springs • HACM Phase II • Jewett – West Fairfield • Evant – Lampasas • Paleface – Miller • Parkdale Dynamic Reactive • Wilson – Sutherland Springs • Skyline Auto #3 RPG Meeting

  3. Bell County – TNP One Temple – Salado Reconductor to 3200A Temple – Boggy Creek Upgrade to 1146 A • Cost: $69,337,000 • In Service: By peak 2011 • Status • Submitted 11/30/2006 • Comments 1/2/2007 • Review 4/24/2007 • Review to be presented Upgrade Limiting Equipment – 2000A New 40 mile 345 kV 2-1590 kcmil ACSR - 2730 A RPG Meeting

  4. Able Springs • Cost: $12,830,000 • In Service: By peak 2010 • Status • Submitted 1/5/2007 • Comments 1/26/2007 • Study Mode 3/16/2007 • Review 4/30/2007 • Under Study Convert 69 kV line from Iron Bridge to Duck Cove to 138 kV, Extend to new 138 kV station Ables Springs, and continue new Build to tap point on Terrell SW. to Royse SW. 138 kV line. RPG Meeting

  5. HACM Phase II • Cost: $37,900,000 • In Service: By May 2009 • Status • Submitted 1/8/2007 • Comments 1/29/2007 • Review 4/29/2007 • Review to be presented Build 345 kV Switch Station Singleton at 345 kV intersection, 345/138 kV Rothwood, convert Rayford 138 station to loop/tap, Upgrade 2 345 kV circuits and 1 138 kV circuit. RPG Meeting

  6. Jewett – West Fairfield • Cost: $17,918,414 • In Service: By peak 2010 • Status • Submitted 2/13/2007 • Comments 3/6/2007 • Study Mode 3/8/2007 • Review 4/22/2007 • Under Study Reconductor Jewett to West Fairfield from 84 MVA to 214 MVA. RPG Meeting

  7. Evant – Lampasas • Cost: $7,788,000 • In Service: By June 2008 • Status • Submitted 2/19/2007 • Comments 3/12/2007 • Study Mode 3/20/2007 • Review Completed • RPG Endorsed Upgrade Lampasas to Adamsville to Evant from 84 MVA To 220 MVA. RPG Meeting

  8. Paleface – Miller • Cost: $9,394,000 • In Service: By end June 2011 • Status • Submitted 2/26/2007 • Comments 3/19/2007 • Review 5/3/2007 • Under Study Upgrade Paleface – Johnson City Phillips – Miller Creek from 82 MVA to 220 MVA RPG Meeting

  9. Parkdale Dynamic Reactive • Cost: $45-98 M • In Service: Peak 2009 • Status • Submitted 2/28/2007 • Comments 3/26/2007 • Currently in Study Mode 4/23/2007 • Review end approx 7/22/2007 Add up to 600 Mvar dynamic reactive devices at Parkdale Station. RPG Meeting

  10. Wilson – Sutherland Springs • Cost: $5,364,665 • In Service: Winter 2009 • Status • Submitted 3/14/2007 • Comments 4/9/2007 • Review 5/24/2007 • Under Study Construct new 220 MVA 138 kV from GVEC Wilson Substation to FELP Sutherland Springs substation. RPG Meeting

  11. Skyline Auto #3 • Cost: $4,000,000 • In Service: peak 2010 • Status • Submitted 3/29/2007 • Comments 4/19/2007 • Review 6/3/2007 • In Comment Period Add 3rd 345/138 kV autotransformer at Skyline substation. RPG Meeting

  12. Questions?