1 / 2

Several presentations on e-cloud status in LHC

Several presentations on e-cloud status in LHC LMC 18/09/2013: overview, present status of understanding

deacon
Download Presentation

Several presentations on e-cloud status in LHC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Several presentations on e-cloud status in LHC • LMC 18/09/2013: overview, present status of understanding • LBOC 08/10/2013: heat loads in cold magnets and extrapolation to future operation (post-LS1): encouraged effort to make heat load and bunch-by-bunch stable phase monitoring on line for 25 ns run • RLIUP Preparation meeting 15/10/2013: overview and extrapolation of heat load values to future operation (post-LS1, PICs, US1, US2) for different scenarios • In general, strong endorsement to plan using doublets in LHC after LS1 to try suppressing the e-cloud in the dipoles (will be followed up within the LBOC, already scheduled on 5 November 2013) • HL-LHC Triplets • WP2 meeting 18/10/2013 • Summary of understanding of the present triplets • Results for the new triplets  need to include in design electron cloud suppression measures (a-C coating and/or clearing electrodes) • E-cloud meeting #5 • Octavio’s rehearsal of PhD defense (mainly LHC results from SS, scrubbing optimization studies with maps, future accelerators) • Discussion on sensitivity of build up simulation on model parameters (when defining thresholds for different filling patterns)

  2. SPS • Scrubbing strategy for 2014: Scrubbing run tentatively fixed on weeks 40 – 41. Decision for coating vs. scrubbing to be made by mid 2015 (detailed strategy will be discussed by Hannes in RLIUP) • Coating planning for LS2: logistics sorted out (building for coating lab, transportation from the tunnel, production rate, etc.), it should be possible to coat 90% of the SPS within 12 months

More Related