An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BMP Construction Estimates August 5, 2009 Dave Brown, PE City of Durham Engineering and Stormwater Services 919/724-7935 david.brown@durhamnc.gov Public Works Department, Stormwater Services

  2. BMP Construction Estimates • The Requirements • Definitions • Whys • Whens • Hows • Other Things Public Works Department, Stormwater Services

  3. BMP Construction Estimates The Requirements A Construction Estimate, prepared by an NCPE, is required for any City of Durham BMP approved and permitted for construction in accordance with the new “Stormwater Facility Agreement and Covenants.” Note A PDF of this document can be viewed at www.durhamnc.gov/departments/works/stormwater_development.cfm. Public Works Department, Stormwater Services

  4. BMP Construction Estimates The Requirements An As-built Construction Cost Accounting, prepared by an NCPE, is required for any City of Durham BMP constructed under the requirements of the new “Stormwater Facility Agreement and Covenants.” Public Works Department, Stormwater Services

  5. BMP Construction Estimates The Requirements An Engineer’s Opinion of Probable Cost, prepared by an NCPE, is required for any existing City of Durham BMP, where the owner or owner-to-be of the BMP wishes to “opt in” to the benefits of the new “Stormwater Facility Agreement and Covenants.” Public Works Department, Stormwater Services

  6. BMP Construction Estimates Definitions • Construction Estimate: An estimate of what it will cost to construct and certify an approved BMP. Public Works Department, Stormwater Services

  7. BMP Construction Estimates Definitions • As-built Construction Cost Accounting: An accounting of the actual costs incurred to construct and certify an approved BMP. Public Works Department, Stormwater Services

  8. BMP Construction Estimates Definitions • Engineer’s Opinion of Probable Cost: An opinion as to what the probable cost was to construct an existing BMP. Public Works Department, Stormwater Services

  9. BMP Construction Estimates Whys A Construction Estimate will be used as the basis for the calculation of the required payment into the City’s Stormwater facility Replacement Fund for a specific BMP. Note: The required payment amount is 25% of the approved estimate. Public Works Department, Stormwater Services

  10. BMP Construction Estimates Whys An As-built Construction Cost Accounting will be used to reconcile a payment into the repair fund. If the Accounting >110% of the Estimate, an additional payment will be required. If the Estimate > 110% of the Accounting, the applicant will be eligible for a partial refund. Public Works Department, Stormwater Services

  11. BMP Construction Estimates Whys An Engineer’s Estimate of Probable Cost will be used as the basis for the calculation of the required payment into the City’s BMP Repair Fund for an existing BMP where the owner or owner-to-be of the BMP wishes to “opt in” to the benefits of the new “Stormwater Facility Agreement and Covenants.” Public Works Department, Stormwater Services

  12. BMP Construction Estimates Whens • Construction Estimate: An Estimate must be provided prior to CD approval. • As-built Construction Cost Accounting: An Accounting must be provided prior to As-Built Certification approval. Public Works Department, Stormwater Services

  13. BMP Construction Estimates Whens • Engineer’s Opinion of Probable Cost: An Opinion must be provided prior to the City finalizing a new “Stormwater Facility Agreement and Covenants” for a particular BMP. Public Works Department, Stormwater Services

  14. BMP Construction Estimates Hows All BMP construction estimates shall be prepared using the BMP construction estimating spreadsheet. Attached is a copy of the latest version. Note: This spreadsheet may be revised or updated periodically. The latest version will be posted on the City’s website. Public Works Department, Stormwater Services

  15. BMP Construction Estimates Hows All BMP construction estimates shall be prepared assuming that the BMP is to be constructed as a stand alone device and shall include the costs of the inlets (from the BMP to 50-ft upstream of the BMP or to the next structure or whichever is closer) to the BMP. Public Works Department, Stormwater Services

  16. BMP Construction Estimates Hows Backup data shall be provided for the costs used in the preparation of the estimate. Public Works Department, Stormwater Services

  17. BMP Construction Estimates Hows Now let’s look at the BMP construction estimating spreadsheet in your packet. Public Works Department, Stormwater Services

  18. BMP Construction Estimates Other Things What about BMPs that were built several years ago? Public Works Department, Stormwater Services

  19. BMP Construction Estimates Other Things What about BMPs that were built several years ago? For BMPs that were “accepted” more than one year preceding the date of the Engineer’s Opinion for that BMP, the Engineer’s Opinion can be discounted in a manner consistent with that contained in the matrix provided below. Public Works Department, Stormwater Services

  20. BMP Construction Estimates Other Things Discounting Matrix Public Works Department, Stormwater Services

  21. BMP Construction Estimates Questions? Public Works Department, Stormwater Services