TGG Internal Discussion on Draft 1 of ENERGY STAR for UPS

TGG Internal Discussion on Draft 1 of ENERGY STAR for UPS. The Benefits of Re-weighting. Re-weighting raises the calculated average for nearly all products Products with low efficiency benefit the most High efficiency products hardly move Higher number on PPDS

dean
Download Presentation

TGG Internal Discussion on Draft 1 of ENERGY STAR for UPS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TGG Internal Discussionon Draft 1 of ENERGY STAR for UPS

  2. The Benefits of Re-weighting • Re-weighting raises the calculated average for nearly all products • Products with low efficiency benefit the most • High efficiency products hardly move • Higher number on PPDS • More margin if the requirements aren’t lowered

  3. VFDYellow circles are Draft 1 weighting, other colors are re-weighted

  4. VIYellow circles are Draft 1 weighting, other colors are re-weighted

  5. VFIYellow circles are Draft 1 weighting, other colors are re-weighted

  6. The Benefits of Lower Requirements • More products will qualify • Some will qualify in every size range of each performance category • Those that would have qualified now have more margin (less likely to fail verification)

  7. VFD

  8. VI

  9. VFI

  10. Requirements Changes