NEWater Infrastructure Plan Transmission Mains Extension to Jurong Island

NEWater Infrastructure Plan Transmission Mains Extension to Jurong Island. Objective This project is to extend the NEWater (NW) transmission network to Jurong Island, to meet the increasing demand of NEWater by industries on Jurong Island. Scope

Download Presentation

NEWater Infrastructure Plan Transmission Mains Extension to Jurong Island

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEWater Infrastructure Plan Transmission Mains Extension to Jurong Island Objective • This project is to extend the NEWater (NW) transmission network to Jurong Island, to meet the increasing demand of NEWater by industries on Jurong Island. Scope • Supply, delivery and laying of approx 5.5km of 2200mm dia and 9.0km of 1600mm dia NEWater pipelines on Mainland and Jurong Island. • Construction & design of approx 3.0km long 6metre dia. segmental tunnel with twin 2200mm dia. pipelines from Jurong Island to Gul Road/Pioneer Road junction. Project Schedule • Calling of Tenders : 4th Quarter 2009 • Scheduled Completion : Jun 2013

  2. NEWater Infrastructure Plan Transmission Mains Extension to Jurong Island