Objective Extend NEWater transmission mains to Jurong Island to meet increasing NEWater demand by industries Scope

NEWater Infrastructure Plan Extension to Jurong Island (NIPE). Objective Extend NEWater transmission mains to Jurong Island to meet increasing NEWater demand by industries Scope 6 Contracts - 11.4km of 2.2m, 11.2km of 1.6m, & 7.2km of 1.2m dia pipelines.

twila
Download Presentation

Objective Extend NEWater transmission mains to Jurong Island to meet increasing NEWater demand by industries Scope

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEWater Infrastructure Plan Extension to Jurong Island (NIPE) Objective • Extend NEWater transmission mains to Jurong Island to meet increasing NEWater demand by industries Scope • 6 Contracts - 11.4km of 2.2m, 11.2km of 1.6m, & 7.2km of 1.2m dia pipelines

  2. NEWater Infrastructure Plan Extension to Jurong Island (NIPE) C5 & 6 C4 C1, 2 & 3

  3. NEWater Infrastructure Plan Extension to Jurong Island (NIPE) 1.2m dia NEWater Pipeline 1.2m dia Potable Water Pipeline 6m dia Tunnel 6 M ID Tunnel 2.2m dia Potable Water Pipeline Support 2.2m dia NEWater Pipeline Support TYPICAL SECTIONAL VIEW OF PIPELINES FOR NIPE CONTRACT 4