NEWater Infrastructure Plan Extension to Jurong Island (NIPE). Objective Extend NEWater transmission mains to Jurong Island to meet increasing NEWater demand by industries Scope 6 Contracts - 11.4km of 2.2m, 11.2km of 1.6m, & 7.2km of 1.2m dia pipelines.
E N D
NEWater Infrastructure Plan Extension to Jurong Island (NIPE) Objective • Extend NEWater transmission mains to Jurong Island to meet increasing NEWater demand by industries Scope • 6 Contracts - 11.4km of 2.2m, 11.2km of 1.6m, & 7.2km of 1.2m dia pipelines
NEWater Infrastructure Plan Extension to Jurong Island (NIPE) C5 & 6 C4 C1, 2 & 3
NEWater Infrastructure Plan Extension to Jurong Island (NIPE) 1.2m dia NEWater Pipeline 1.2m dia Potable Water Pipeline 6m dia Tunnel 6 M ID Tunnel 2.2m dia Potable Water Pipeline Support 2.2m dia NEWater Pipeline Support TYPICAL SECTIONAL VIEW OF PIPELINES FOR NIPE CONTRACT 4