1 / 5

Towards a Neutrino Factory scoping study

Towards a Neutrino Factory scoping study. Background:. Intellectual: Feasibility studies: US: I, II, Ia EU: CERN ‘yellow report’ JP: Design report Need inter-regional cooperation for ‘Study III’ Recognised at NuFct03 Social: Essential to develop collaboration

december
Download Presentation

Towards a Neutrino Factory scoping study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Towards aNeutrino Factory scoping study

  2. Background: • Intellectual: • Feasibility studies: • US: I, II, Ia • EU: CERN ‘yellow report’ • JP: Design report • Need inter-regional cooperation for ‘Study III’ • Recognised at NuFct03 • Social: • Essential to develop collaboration • Neutrino source for precision measurements of neutrino properties necessarily requires an international collaboration • Political: • European Strategy Forum on Research Infrastructure: • Preparing roadmap for major research infrastructure • Funding: • FP7: Design Study call, expected autumn 2006 • UK funding cycle

  3. Scoping study: request for proposal

  4. Scoping study: request for proposal • Empowering invitation: • Recognition of crucial nature of international partnership • Framework for discussion leading to: • Source(s) required for optimal precision exploration of neutrino properties • Consensus on options to be taken forward; • Identification of critical R&D items (h/w and concept development); • Definition of interfaces, performance goals etc. that can be studied in the next conceptual design phase; • Establishment of collaboration for the next phase.

  5. Discussion: • Just at the start; request only ‘a week old’ • Take forward on afternoon of Thursday 17Mar05 • Proposed timescale (working backwards): • Hand in proposal: 27May05 • Full draft of proposal: 13May05 • Meeting to discuss/agree content: 08-08May05 RAL • An exciting opportunity! • (And much work to do)

More Related