Tutorial 4: Excavation between two walls connected with two struts

Tutorial 4: Excavation between two walls connected with two struts. Deep Excavation LLC. DeepXcav 2011 – Advanced course. 1. INTRODUCTION.

deidra
Download Presentation

Tutorial 4: Excavation between two walls connected with two struts

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tutorial 4: Excavation between two walls connected with two struts Deep Excavation LLC DeepXcav 2011 – Advanced course 1

  2. INTRODUCTION DeepXcav is a software program for braced excavations in soils with 2D limit-equilibrium and non-linear analysis methods, and structural verification of all elements (with AISC, ASD, Eurocodes). It offers the ability to analyze walls with multiple braces (tiebacks) in multilayered soils. The non-linear analysis considers elastoplastic behavior for the whole soil-wall-support system. The program also offers the ability to perform traditional limit-equilibrium analyses. The graphical interface is completely interactive and the input is simplified to a great extend. The program utilizes archives of wall types, structural and soil materials, ground anchors etc. The analysis can be performed in either an utlimate state or at a service state (allowable design or LRFD). The program offers the ability to automatically set all critical settings according to the desired design methodology. The program also offers the ability to perform slope stability analyses with soil nails. Corso Paratie, Milano 30 settembre 2009 DeepXcav 2011 – Advanced course 2

  3. Change the Surface Level to 100 m Go to the General Tab and press the Move Model Elevation button Change the Elevation to 100 m and select All Boreholes Press Ok DeepXcav 2011 – Advanced course

  4. Add 2nd Wall At Stage 0, go to Model Tab and press the Add 2nd Wall button. DeepXcav 2011 – Advanced course

  5. Edit Wall Section By double-clicking on the wall, you can change the wall properties DeepXcav 2011 – Advanced course

  6. Change 2nd wall x-coordinate to 20 m We can edit the section data or the wall dimensions here Change 2nd wall x-coordinate to 20 m Press Ok DeepXcav 2011 – Advanced course

  7. Add new Stage Go to the Model Tab Press the Add Stage Button DeepXcav 2011 – Advanced course

  8. Perform a 3m Excavation between the two walls and add a new Stage Change the center elevation to 97 m Click on the Add Stage button DeepXcav 2011 – Advanced course

  9. Add a strut connecting the two walls Press the Add a strut button Click on the two walls to connect them with a strut DeepXcav 2011 – Advanced course

  10. Change the strut elevation to 97.5 m Change the z-coordinate of the support to 97.5 You can edit the support section Press Ok DeepXcav 2011 – Advanced course

  11. Add a new Stage and excavate 3 m Change the center elevation to 94 m Change the water elevation to 94 m Add a new Stage DeepXcav 2011 – Advanced course

  12. Add a new Stage and a strut connecting the two walls. Change the strut elevation to 94.5 m DeepXcav 2011 – Advanced course

  13. Add a new Stage and perform a 3m Excavation Change the center elevation to 91 m Change the water elevation to 91 m Press the Add Stage Button DeepXcav 2011 – Advanced course