RPC Detector Review Hardware Status and New Technical Procedures CMS Week, RPC Operation Review Anton Dimitrov
CMS RPC EQUIPMENT • Detector and Service EQUIPMNET • Known Problems • Procedures CMS Week, RPC Operation Review Anton Dimitrov
DETECTOR AND SERVICE EQUIPMENT BARREL ENDCAP TRIGGER SPARE UXC USC UXC USC UXC USC Barrel Endcap Spare Spare Spare Trigger • EQUIPMENT ALREADY UPLOADED in EMDb • EQUIPMENT TO BE UPLOADED in EMDb – till end of June 2010 CMS Week, RPC Operation Review Anton Dimitrov
PROBLEMS by TYPE KNOWN PROBLEMS Chambersin SG Slow Control Masked Rolls Threshold Control TPH Sensors PROBLEMS by SEVERITY 1) Problems for long shutdown/CMS opening 2) Problems for NEXT UXC ACCESS 3) Reappearing Problems CMS Week, RPC Operation Review Anton Dimitrov
Technical Procedures • How to deal with a new equipment problems? • How to create a work package when access is announced? • How to replace equipment in UXC? • How to replace equipment in USC? CMS Week, RPC Operation Review Anton Dimitrov
How to deal with an equipment problem Operation Manager Savannah elog P5 SHIFTER RPC Equipment Manager Automatic mail Savannah HARDWARE EXPERT Automatic mail Savannah
EMDB Manager CMS RC&TC, GLIMOSSLIMOS, RFM, CSL Announce EMDB System Experts ACCESS Access Subdetector RFM(Operation Managers) RP Sweep Request/Modify Open/Close Access Open Authorize Request/Modify Open/Close Supervise (Full Rights) RP WP Technicalshifter Change Data (Full System Rights) Control Give Access/Key Use WP name to check in equipment Check Equipment UXC Operational Spare Operational EMDBEQUIPMENT BUFFERZONE Defective Tested Still Defective Repair Take after RP check Waste Broken
Work Package List CMS Week, RPC Operation Review Anton Dimitrov
Work Packages by system CMS Week, RPC Operation Review Anton Dimitrov
BARREL HV INTERVENTIONS CMS Week, RPC Operation Review Anton Dimitrov
Barrel HV System: Summary by Components II Trimester CMS Week, RPC Operation Review Anton Dimitrov
Barrel HV System Status II trimester • Broken Y in Distributor Boxes: 6/480; ~ 1.2% (0.6%*) • Broken long black cables (USC – UXC): 11 (7*) • Spare black cables used 17/480; ~ 3.5% (2.7%*) • 473** RPC in DG mode 473/480; ~ 98.54% (98.75%*) • 5 RPC in SG mode 10/1020; ~ 1% (1%*) • 1 RPC totally dead 1/480; ~ 0.21% (0.21%*) N.B. * => Barrel HV system status for I trimester 2010 ** => 1 RPC OFFdue to LV problem (next slide) CMS Week, RPC Operation Review Anton Dimitrov
Barrel Low Voltage/Slow Control Status II Trimester • 1 RPC LV OFF 479/480 ~ 0.21%(0%*) • 18 RPC I2C lines (in 17 chambers) not working in the Barrel 18/800 ~ 2.25% (2.13%*) • Redundant DT lines working for 8/18 ~ 44%(9/17~53%*) • 10/800 I2C lines in the Barrel not controlled at all ~ 1.25% (8/800 ~ 1%*) • Vth or Vmon values not settable on chip basis in 4 cases in the Barrel (no change*) CMS Week, RPC Operation Review Anton Dimitrov
Barrel Threshold Control History CMS Week, RPC Operation Review Anton Dimitrov
Endcap HV Interventions and Status During last 3 months total 7 (6 trpping+1spikes) HV problems were reported CMS Week, RPC Operation Review Anton Dimitrov RE+2/2, 3/11- Tripping: Problem localized in HV distributor so fixed it by using the spare channel. (On April08) RE-1/3/31, 32- Spikes: Problem localized in RE-1/3/31 (TOP) so disconnect this gap and run rest of three gaps. (On April08) RE-1/3/05, 06-Tripping: Localized ~ at PP so fixed it by changing the tripolar connector in UXC. (Reported on April10) RE-3/2, 3/26-Tripping- Fixed by changing connector in UXC at PP. (On April 28) RE-1/3/35, 36-Tripping– Actually problem was in RE-1/2/01,02 because channels were swapped. Put back the channels at original position. Problem do not reproduce. (On April 28 RE+1/2/21, 22- Tripping– During TA31052010 switch on back this channel so it start working without any intervention and it is working up to now.(Reported on May06) RE-2/2,3/11-Tripping- During TA31052010 swapped the channel with RE-2/2,3/12 both are working without any problem. (Reported on June 02). Saleh Muhammad NCP Islamabad
Endcap LV Interventions and Status CMS Week, RPC Operation Review Anton Dimitrov RE+2/2, 3/31- Tripped (LV FEB)Fixed the problem by changing the problematic module with good spare one. (On March 11). RE-3/2, 3/25 –Tripped (LV FEB) Localized the problem in the module channels. Fixed the problem by changing the module also by repairing the connector which break during changing the module . (Reported on May19) LV modules serial no.47 which was replaced form P5 test it in bld.904 testing setup. The board did not give the problem again so put it back into system at P5 on May31. On 1st of April the X2S32 rack (YE-1 far side, X2 level) all electronics become off due to rising the temperature of MAO at 29C and LV boards at 40C. This happen due to power failure of the turbine. But after 4 hours power came back and just switching on the MAO and boards everything start working. Saleh Muhammad NCP Islamabad
Endcap Summary (RPC TCM) CMS Week, RPC Operation Review Anton Dimitrov Saleh Muhammad NCP Islamabad
Trigger USC electronics CMS Week, RPC Operation Review Anton Dimitrov CAEN VME controller failedin one Trigger Crate on night 18/19 April 2010. Replaced by a spare on 19 April. It was checked that only mezzanine board with optics was damaged (most probably optical transmitter). At the moment no other problems - 100% of the system functional!!! Karol Buńkowski, CERN, UW
Trigger Link System CMS Week, RPC Operation Review Anton Dimitrov • ~10 March: one Half Box tripped during normal operation(not during power on), first we have replaced the LV module, but it did not helped, so then we have replaced all boards from that Half Box (CB, 2x MLB,4x SLB), and this helped. Test showed that: • CB Actel damaged, the CB itself is OK, • GOLs on both MLB damaged, • SLBs are OK, • RB+1 far (24 April 2010) - problems with the CCU ring: • FEC mezzanine was not well attached to the CCU board. • When it was corrected CCU errors appeared again. So the FEC mezzanine was swapped with other one. After that both FECs were working correctly. Possible reason: FEC and the ribbon fiber connectors “not compatible”??? • RB+2_near (31 May 2010) - the CCU errors become very frequent,~every second (before that ring had a few CCU errors per day), • The ring B for that tower was disconnected, after that no CCU errors. • CCU errors appear only on one-two rings, with low rate. In most of the cases are recovered by the reset_fec automatically executed by the online software. • The system is working stable - 100% of the system functional Karol Buńkowski, CERN, UW
Trigger Firmware CMS Week, RPC Operation Review Anton Dimitrov 22 April - CB firmware updated - problem with the LB firmware loading from FLASH corrected 14 June 2010 Karol Buńkowski, CERN, UW
Trigger Online Software Status CMS Week, RPC Operation Review Anton Dimitrov The Trigger Supervisor control over the full system (Link System, Trigger System, RBC/TTU) is working fine. • Latest improvements: • Monitoring panels in TS(the data from the XDAQs to the TS are send with use of the flash lists) • Panel in the TS LBox Worker: • Disabling the LBox XDAQs from the TS control • Loading the LB firmware • Presenting the LBox XDAQs status • Panel in the TS Cell: • disabling the TC XDAQs from the TS control • Presenting the TC XDAQs status • Alarms in the HOTSOPT • GUI for disabling the Sorter Crate inputs (in case of the Trigger Crate malfunction) • To do next: • Better management of the configuration data (different local config keys for different parts of the system), • FEB configuration from the DB • Storing monitoring data in the condition database Karol Buńkowski, CERN, UW
Two main changes have occurred this year Regulation Valve change on the “Endcap cooling circuit Week 17 2010 The changes of set Point and regulation Parameters since Week 20 2010 Continuing Concerns Low contingency Temps still high in Endcaps Temp gradients along Z in RE RPC Cooling
RPC Temperature Distributions 21.92C 20.83C 20.25C 19.41C 18.67C 20.25C 20.33C 19.90C 19.79C 20.32C 21.33C +Z -Z RB0 0.75C 0.5C 0.8C 0.8C 0.7C 0.6C Gains since April 2010
Gas Status • New gas leak in WP2_S05_RB2 notified to CERN gas group. • W0 readout board replaced (middle of March). No effect on RPC operation • Warning due to purifiers fixed. • New Flow cell threshold settings for warnings and alarms uploaded into DB. This did not solve the sporadic warnings due to spikes on cells readout. For this is needed a new approach in the warning treatment to be implemented into RPC-DCS. Discussion on this is ongoing with G.Polese. CMS Week, RPC Operation Review Anton Dimitrov L. Benussi
Gas Flow cell Reading fluctuations CMS Week, RPC Operation Review Anton Dimitrov L. Benussi
Conclusions • Partitions that cannot be threshold controlled are increasing in time, leading to the dilemma “noise vs. masking”! • Apart from that Detector Performance is stable! • For better Detector performance threshold refinement is required => DB is highly needed! • Temperatures in Endcap still higher than 20°C, but decreasing after the change of coolant set-point. • Signals of after pulsing raised again the question of individual chamber HV working point definition. • Still lot of effort to be put in order to update all the instructions! CMS Week, RPC Operation Review Anton Dimitrov