1 / 10

RPC Trigger Electronics Review

RPC Trigger Electronics Review. Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw. Krzysztof Doroba, RPC TRigger Review, 22.01.2009. Low Voltage. Low Voltage for Link Board System 68 A3016 9 A3486S+1A3486=10 MAO’s 21 Easy Crates

vinnie
Download Presentation

RPC Trigger Electronics Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RPC Trigger Electronics Review • Subjects: • Link System Low Voltage • Link System Upgrade Krzysztof Doroba, University of Warsaw Krzysztof Doroba, RPC TRigger Review, 22.01.2009

  2. Low Voltage • Low Voltage for Link Board System • 68 A3016 • 9 A3486S+1A3486=10 MAO’s • 21 Easy Crates Performance/Problems • Painfull breaking period of CAEN products - factory recalls due to design imperfections • 4 A3016 not delivered yet • 2 MAOs and 3 A3016 failed during operation (fixed)‏ Krzysztof Doroba, RPC TRigger Review, 22.01.2009

  3. Low Voltage and Upscope • Power Supply for VM Trigger Crates • -already covered by Wojtek Okliński talk • RPC System Upgrade: • re-addinng re4 for η<1.6 • extend acceptance up to η=2.1 Krzysztof Doroba, RPC TRigger Review, 22.01.2009

  4. MB4 MB3 MB2 MB1 Muon Chamber Geometry Today Reduced RE system || < 1.6 1.6 RPC ME4/1 restored ME3 ME2 ME1

  5. Geometry After Upscope MB4 MB3 MB2 MB1 Upgraded RE system || < 2.1 RPC ME4/1 restored ME3 ME2 ME1

  6. RPC Trigger Upgrade RPC Trigger System Upgrade • Trigger (USC55) part - covered by Wojtek Okliński • Link System (UXC55) part • more linkboards (MLB,SLB,CB)‏ • more linkboard boxes (LBBox)‏ • more LV PS • extra cabling Krzysztof Doroba, RPC TRigger Review, 22.01.2009

  7. MLB SLB CB LBB re1,2<1.6 96 192 48 24 re3<1.6 48 96 24 12 Total Endcap 144 288 72 36 Total Barrel 300 500 120 60 Total <1.6 444 788 192 96 Link system (1)‏ Staged Link system Krzysztof Doroba, RPC TRigger Review, 22.01.2009

  8. MLB SLB CB LBBox re4<1.6 48 96 24 12 MLB SLB CB LBBox re1>1.6 72* 12* 12* re2>1.6 24 24 0 re3>1.6 24 24 0 re4>1.6 24 24 0 total>1.6 144 72 12 Link system (2)‏ re-adding re4 for |η|<1.6 Extending re1,re2,re3,re4 up to |η|<2.1 **MLB, CB and LBB for re1/1 are of the special type Krzysztof Doroba, RPC TRigger Review, 22.01.2009

  9. LBB boards MLB SLB CB Total Total (+spares)‏ produced 444 788 192 1424 1600 upgrade hi eta (w/o re1/1, re4)‏ 48 48 96 110 upgrade re4, <2.1 72 120 24 216 240 upgrade re1/1 72 12 84 100 LV LBB A3016 A3486 installed system 96 64 10 upgrade re4, re1/1 24 16 2 upgrade re1/1 12 8 2 Link system (3)‏ Low Voltage system upgrade: Krzysztof Doroba, RPC TRigger Review, 22.01.2009

  10. LB System Cables • LB system for RE4 needs new cabling (from LBB to USC) and room for crates • RE1/1 requires no new cabling, LBBoxes installed • RE1/1 requires room for Power Supplies • Questions: • room for RE1/1 LV PS at YE+1,YE-1? Krzysztof Doroba, RPC TRigger Review, 22.01.2009

More Related