1 / 31

PRESENTATION-OUTLINE

Explore the need for sustainable projects in Africa due to the growing demands on its natural resources. Learn about the project life cycle, key challenges, and the advantages of working with WAPCOS, a leading organization in water, power, and infrastructure development projects.

deloresm
Download Presentation

PRESENTATION-OUTLINE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRESENTATION-OUTLINE • Need of the Sustainable Projects • A Typical Project Life Cycle • Key challenges • About WAPCOS • Key Partner Organizations • Our Domain Sectors • Our USP • Geographical Reach • Challenges & Opportunities • What our clients say • WAPCOS Advantage. 2

  2. THE NEED OF SUSTAINABLE PROJECTS • Natural Resources are the KEY DRIVERS of Africa’s Growth . • Demands will grow exponentially which will put more pressure on its natural resources. • If Growth is unmanaged it may exhaust Africa’s natural resources. • Need to scrutinize vulnerability and challenges associated with sustainability concept. • Sustainable development gets forgotten when new challenges emerge. • Sustainability in all development Models is a pre-requisite for Africa to realise its Millennium Developmental Goals . THE NEED OF SUSTAINABLE PROJECTS

  3. Reconnaissance Survey & Preliminary data collection Project Conceptualization Techno-economic Analysis Modernization& Rehabilitation Feasibility Study Assessment of Water Resources & Water Requirement Viable Project LIFE CYCLE OF PROJECTS Environmental Studies EIA; EMP & R&R Baseline Surveys Detailed Surveys & Investigations Commissioning & O&M Detailed Project Report WR Policy Framework & Support measures Preparation of Engineering design and Drawings Socio-cultural & Gender aspects Construction Economic and Financial Analysis Project Management Contract Management, Construction Supervision, Quality Control Institutional & Policy Aspects Cost Estimates Tender Engineering, Construction Drawings 4

  4. Key Challenges • Project Development Gaps – Biggest Impediment to Development • Financing is available but Bankable Projects are not available

  5. ABOUT WAPCOS • HISTORY • Established under the aegis of Ministry of Water Resources in 1969 with a view to: • Provide opportunities to Indian Engineers to work in diverse geographical and climatic conditions. • Facilitate Diplomatic Initiatives to forge long term relations with other developing Countries and contribute in their economic development. • To pool and share the expertise and technical knowhow - with other Nations. • To augment endeavors of State and Central agencies by providing total engineering solutions . • TODAY WE ARE • A Miniratna-1 Category Organisation. • More than 1000 Strong workforce worldwide. • Robust world class Multidisciplinary Expert work Force. • State of the art Software/Hardware Resources. • Providing cutting edge consultancy to projects in Water, Power & Infrastructure. • Over 30 offices world wide. 6

  6. KEY PARTENER ORGANISATIONS CENTRAL WATER COMMISSION CENTRAL GROUND WATER BOARD GEOLOGICAL SURVEY OF INDIA SURVEY OF INDIA CENTRAL WATER AND POWER RESEARCH STATION CENTRAL SOIL & MATERIALS RESEARCH STATION CENTRAL ELECTRICITY AUTHORITY 7

  7. REGISTRATION WITH INTERNATIONAL ORGANIZATION • World Bank • Asian Development Bank • African Development Bank • Japan Bank for International Cooperation • United Nations Office for Project Services 8

  8. Quality Management System • Quality Management System conform to ISO 9001:2008 for Consultancy Services in Water Resources, Power and Infrastructure Development Projects • Renewed on 3rd November, 2011 • Valid upto 23rd October, 2014 • WAPCOS is accredited by NABET for conducting EIA Studies for Projects in the areas of River Valley, Thermal Power, Mines, Ports & Harbours and Building Construction 9 9

  9. OUR DOMAIN SECTORS - WHERE WE SPECIALISE • Water Resources • Irrigation, Drainage and Water Management • Ground Water Exploration and Minor Irrigation • Flood Control and River Morphology • Water Bodies and Lakes Conservation • Agriculture Including Dry Lands Farming • Power • Hydro Electric Projects • Thermal Power Projects • Transmission & Distribution • Rural Electrification • Infrastructure • Water Supply, Sanitation and Drainage • Environmental Engineering • Ports & Harbours and Inland Waterways • Urban and Rural Areas Development • System Studies and Information Technology 10

  10. Basket of Services • Reconnaissance Surveys • Feasibility Reports • Topographical Surveys • Geo-Technical Investigations • Construction Material Surveys • Detailed Project Reports (DPRs) • Environment Impact Assessment • Engineering Designs • Cost Estimates • Socio-Economic Surveys • Tender Engineering • Project Management • Socio-Economic Studies • Outreach Activities • Monitoring & Evaluation • Training & Capacity Building • Operation & Maintenance 11

  11. USP- WATER RESOURCES Survey & Investigation/ Pre-feasibility/Detailed Project Reports for over 300 Projects in Irrigation, Water Resources, Flood Control, Ground Water, Agricultural etc. Contributed in Development of Irrigation Potential of Over12 Million Ha. Environmental ImpactAssessment(EIA) Studies for over 250 Projects in India & Abroad in the fields of Irrigation, Hydro Power, Thermal Power, Ports & Harbour 12 12

  12. USP- INFRASTRUCTURE Surveys & Investigations/ Modeling/Detailed Engineering for over 180 Ports and Inland Navigation Projects Surveys & Investigation/Detail Project Reports & Project Management Consultancy for over 200 Projects in Water Supply & Sanitation, IEC, Rural & Urban Development, Roads and Highways Engineering etc. 13 13

  13. USP- POWER USP (Contd.) Overseas India • 51 Hydro Power Projects in 19 Countries with an installed capacity of more than 20,500 MW • 10 Thermal Power Projects with an installed capacity of more than 2900 MW • 21 Transmission Projects • Over47Hydro Power Projects with an installed capacity of more than 9000 MW • 9Thermal Power Projects with an installed capacity of more than 12000 MW • 5 Transmission Projects 14

  14. GEOGRAPHICAL REACH AFGHANISTAN ARMENIA BANGLADESH BHUTAN CAMBODIA GEORGIA INDONESIA KOREA LAO PDR MALAYSIA MYANMAR NEPAL PHILIPPINES SINGAPORE SRI LANKA TAIWAN VIETNAM ANGOLA BENIN BURKINA FASO BURUNDI CAR CHAD DR CANGO ETHIOPIA GUINEA GHANA KENYA LESOTHO MOZAMBIQUE MALAWI NIGER NIGERIA NAMIBIA RWANDA SENEGAL SWAZILAND SOUTH SUDAN UGANDA ZIMBABWE ZAMBIA ASIAN REGION AFRICAN REGION COMPLETED /ONGOING PROJECTS IN OVER 50 COUNTRIES 15 offices across the world 15

  15. CHALLENEGS & OPPORTUNITIES WATER RESOURCES DEVELOPMENT

  16. CHALLENEGS & OPPORTUNITIES AGRICULTURE DEVELOPMENT

  17. CHALLENEGS & OPPORTUNITIES POWER DEVELOPMENT

  18. What our Clients say 19

  19. --------”We are happy to note that WAPCOS has been conferred the prestigious Water Award 2012-13 under the category of “Best Consultancy Organisation”. Please accept my heartiest congratulations and good wishes for this creditable achievement”------ Chairman & Managing Director 28th February, 2013 -------” WAPCOS to greater heights in improving its efficiency, professionalism and delivery. We, in Ministry of External Affairs, look forward to continuing our relationship with WAPCOS, in a world where competition is becoming sharper”----- 1st March, 2013 Export-Import Bank of India --------”Please accept my congratulations for the “Best Consultancy Organisation” Water Award 2012-13 conferred on WAPCOS. I hope that WAPCOS will look at the significant opportunities in Vietnam in the power sector”------ 28th February, 2013 20 20

  20. ------------”I take this opportunity to congratulate you and your efficient team for doing excellent work in the field of water and power consultancy. I am sure if you and your team continue to work with the same zeal”---------- 1st March, 2013 -------------”It is heartening to note that WAPCOS Limited has been conferred PSE Excellence Award 2012 for Best Human Resources Management for the excellent initiatives. We are confident that there are many more accolades in store for WAPCOS under your leadership and guidance. We are proud of our association and on-going cooperation with WAPCOS”------------- Executive Director 12th March, 2013 21 21

  21. ------------”A befitting recognition of the excellent initiatives taken up by WAPCOS in the area of Human Resources which is fundamental to effective performance by any organisation”-------- 21st March, 2013 ---------”Is ample recognition of the excellent performance put in by WAPCOS Limited over the years”-------- 4th April, 2013 22 22

  22. --------”WAPCOS would strive for setting higher milestones in all spheres of its core competence activities and contribute significantly to the global development of Power Sector. I, on behalf of Central Electricity Authority, assure you all co-operation and support in future as well ”---------- 26th March, 2013 --------”Company for your sterling performance, I wish to assure you that the Mission would do its utmost to strengthen the presence of WAPCOS Limited, in Ghana for the mutual benefit of both sides”-------- 5th April, 2013 23 23

  23. What our Clients Say 24

  24. Nuclear Power Corporation of India Limited “We would like to place on record our deep sense of satisfaction for the quality of work done by M/s WAPCOS Ltd. The presentation was quite lucid and compressive and the depth of study carried out in the complete assignment was fairly evident. It addressed many concerns of our team. NPCIL found gist of our study very comprehensive and to the point” 31th July, 2012 Ministry of Rural Development, Royal Government of Cambodia “We have receive Field Investigation Report of 1500 Hand Pumps to be supplied and installed in Kampong Cham and BanteayMeanchey Provinces in Cambodia for augmentation of rural drinking water supply. We appreciate the report and the extensive field investigation work done by WAPCOS Limited and confirm the 1500 locations identified by WAPCOS for installation of Hand Pumps.” 11th September,2012 Lao People’s Democratic Republic “This is to certify that M/s WAPCOS Limited (a Government of India undertaking) was engaged as Project Management Consultant for successful execution of the Nam Song Hydro Power Project (3x2 MW), Lao PDR. All the three units of the project, each of 2MW of Nam Song Hydro Power Project have been commissioned successfully on 31.08.2012 under the supervision of WAPCOS. EDL-GEN has enjoyed good working relations with WAPCOS. The professionalism imparted by WAPCOS throughout the duration, appropriate to the need of the project activities is highly appreciable.” 5th September, 2012 25

  25. Rural Electrification Agency, Zimbabwe • This is to certify that WAPCOS Limited, a Govt. of India Undertaking has successfully and timely submitted the feasibility reports for the following Small/Mini Hydro Power Projects in Zimbabwe during January 2012 as per the requirement of Rural Electrification Agency, Zimbabwe. • Duru Hydro Electric Project (6MW) • Siya Mini Hydro Scheme (250 kW) • Ruti Mini Hydro Scheme (150kW) • Feasibility Report for “Decentralised Solar Photovoltaic Power Solutions for Rural Areas in Masvingo Province” • 10th April,2012 Ministry of Agriculture and Animal Resources, Republic of Rwanda WAPCOS LTD. Has been assigned to prepare a feasibility report for Irrigation Project in Kirehe District, Western Province. It is a great pleasure to place on record that the services provided by WAPCOS are of a very high standard. The efforts put by the WAPCOS Team are commendable. 23rd December, 2011 Punatsangchhu Hydroelectric Project Authority This is to certify that WACOS LTD. Is providing Consultancy Services for Main Civil Works, Electro-Mechanical Works and Infrastructure works for Punatsangchhu-I & II H.E. Project, vide agreement made between WAPCOS Ltd. and Punatsangchhu H.E. Project Authority. The Consultancy work is being provided satisfactorily as per agreed time schedule and Project Milestone of River Diversion has been achieved on time. 31st March,2012 Ministry of Housing & Urban Poverty Alleviation, Govt. of India It is to certify that WAPCOS Ltd. (a Govt. of India Undertaking) has been appointed as Third Party Inspection and Monitoring Agency at the Central level for the work of third party inspection & Monitoring of Basic Services to Urban Poor (BSUP) & Integrated Housing & Slum Development programme (IHSDP) Projects under Jawaharlal Nehru National Urban Renewal Mission (JNNURM) in 15 states (for 56 BSUP and 67 IHSDP projects) vide this office letter no. N-11027/34/2009-IHSDP dated -15.01.2010 and N-11027/34/2009-IHSDP (Vol.II) dated-11.11.2011. So far the reports submitted by WAPCOS are in order and their performance has been found satisfactory. 24th April,2012 26

  26. WAPCOS ADVANTAGE? Our clients believe in our What we Ensure • Customized solutions Specific to the project & Client’ requirement. • World class expert Manpower. • Best Project concepts & Planning. • Effective mitigation of project developmental gaps. • Cost effective project solutions. • Innovative design & implementation. • Total project solution from Concept to commissioning. • CORE COMPETENCIES to tackle complex & interrelated tasks. • Unique blend of Direct & frontline experience with latest state of art technological skills • Reasonableness of Costs • The scale , type , number of the projects handled and the impact • The willingness to go an EXTRA MILE to meet the challenges our clients expect from us. 27 27

  27. CONCLUSION • Sustainability canvas has lot of paint but still does not provide a clear picture. • It is a transformative process across scales . • A commitment to paradigm shift towards sustainability principles is needed. • The time to act is now . • India-Africa to synergise further for better future of Mother Earth. • Role of Consultant is crucial to ensure Sustainable Development leading to following- • Water Security • Energy Security • Social Security • Food Security • Health Security • Livelihood Security • Ecological security LETS MAKE OUR PLANET EARTH WORTH Y OF INHERITING FOR OUR GEN- NEXT

  28. ROLE OF CONSULTANT PILLARS OF SUSTAINABILITY Strengths of a Consultant • Consultants are someone who have ‘walked the walk’ hence more credible. • Experience in solving similar problem helps find quick solution • Structured approach to the problems with proven methods and tools • Specific experts for specific problem • Can advise on Strategic, operational, technological & organizational issues • Can act as trusted external adviser to the decision makers facing critical challenges

  29. CUSTOMISED SOLUTIONS- MODELS OF SERVICES • Consultant to Funding Agencies • As Lender’s Engineer • Review of Feasibility Report • Evaluation of DPR • Test Check of Designs & Drawings • Pre-Shipment Testing/Inspection • On site Inspection & Testing • Value addition by way of Technical Inputs • Post Project Evaluation • Consultant in Consortium • Techno-Economic Analysis • Bid Documents • Detailed Design Engineering • Manpower and Construction Scheduling • Contract Management • Work Measurement and Billing • Human Resource Development • Consultant to Project Developer • As Owner’s Engineer • Feasibility Studies • Detailed Project Report • Tender Engineering • Pre-Shipment Testing/Inspection • Construction Supervision • Quality Control • Capacity Building • Institutional Strengthening 32

More Related